WELL · 42-417-33035 · DISTRICT 7

Green South 62B #3

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Green South 62b #3 (API 42-417-33035) is a plugged well in Shackelford County, plugged September 20, 2022, last operated by Basin Operating Inc..

The RRC has issued one drilling permit, issued October 9, 1979, permitted to 1,351 ft.

It was permitted by Jones CO. and has since transferred to Basin Operating Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including B/Dothan, T/Congl Colorado, T/Stockweather, Tanehill.

Operator of record

Basin Operating Inc.

Permitted by Jones Co.; the EWA schedule now lists a different operator.

Albany, TX · P-5 Y, filed Apr 4, 2026 · 4 permits on file · (817) 233-7077

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBasin Operating Inc.
Production reportsBasin Operating Inc.through May 2014
Latest permitJones Co.Oct 9, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,351
total depth, ft
1
permits on file
Oct 9, 1979
last permit issued
Apr 28, 2015
completed
0
cumulative oil, bbl
14.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 28, 2015
Shut in
—
Plugged
Sep 20, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Green South "62B" G-8-267482Shackelford County RegularBasin Operating Inc.1010.8KNov 2012 – Sep 2022
Green South "62B" O-8-15493Shackelford County RegularBasin Operating Inc.103.68KJan 1993 – May 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Basin Operating Inc.Nov 2012 → May 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
60384-99DrillJones Co.Oct 9, 1979Oct 9, 1979—1,351

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-267482————
—— O-8-15493————

Formation tops

As filed on W-2/G-1. Subsea from 1,646 ft elevation.Download CSV →

FormationMD ftSubsea
B/Dothan821825
T/Congl Colorado884762
T/Stockweather1,000646
Tanehill1,082564
B/XTR Falls1,288358
T/Hope Sand1,295351

Perforations

Perforated and open-hole intervals.

FromToType
1,0821,092Perforated
1,2041,219Perforated
1,2961,301Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,314——
5.51,3507.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 6, 2015Jul 1, 2015—
00May 2, 2013Nov 19, 2012—
00Jan 12, 1984Nov 12, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

80
bbl, last 12 reported months
34.2K
bbl, all reported
Jun 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112091H-1 InjectionPlugged Oct 17, 20222,0005401,080–1,219

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 80 · prior 12 320(-75%)

010020030020212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41733035, documented in the API reference.