WELL · 42-417-33557 · DISTRICT 7

Newell 2 #1

Y

Shackelford County · Newell(caddo) field · Producing  · Vertical

Newell 2 #1 (API 42-417-33557) is a well in Shackelford County operated by Petex, completed March 17, 1981 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 20, 1980, permitted to 5,081 ft.

It was permitted by Jones CO. and has since transferred to Petex on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Petex

Permitted by Jones Co.; the EWA schedule now lists a different operator.

Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetex
Production reportsPetexthrough Apr 2026
Latest permitJones Co.Oct 20, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,081
total depth, ft
1
permits on file
Oct 20, 1980
last permit issued
Mar 17, 1981
completed
0
cumulative oil, bbl
999K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 17, 1981
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Newell 2 G-8-92722Newell(caddo)Petex10999KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 16,647 · prior 12 19,251(-14%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → May 2021
  3. 3PetexJun 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
96083-99DrillJones Co.Oct 20, 1980Oct 20, 1980Nov 1, 19805,081

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-92722————

Perforations

Perforated and open-hole intervals.

FromToType
4,639—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510212.2575 S
2.3754,550——
4.55,0507.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 13, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41733557, documented in the API reference.