WELL · 42-417-33570 · DISTRICT 7
Davis Ranch 46 #4
Shackelford County · Davis Ranch (Hope Sand) field · Producing · Vertical
Davis Ranch 46 #4 (API 42-417-33570) is a well in Shackelford County operated by D.J. & T. Energy, completed March 23, 1981 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued October 28, 1980, permitted to 3,510 ft.
It was permitted by King, Frank J and has since transferred to D.J. & T. Energy on the wellbore schedule.
Its lease has reported 36.9K barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by King, Frank J; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Jan 4, 2026 · 10 permits on file · (325) 370-4947
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | D.J. & T. Energy |
| Production reports | D.J. & T. Energythrough May 2025 |
| Latest permit | King, Frank JOct 28, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,510
- total depth, ft
- 1
- permits on file
- Oct 28, 1980
- last permit issued
- Mar 23, 1981
- completed
- 36.9K
- cumulative oil, bbl
- 23
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 23, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis Ranch "46" O-8-16615 | Davis Ranch (Hope Sand) | D.J. & T. Energy | 5 | 36.9K | 23 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 60 · prior 12 149(-60%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thunderbolt Oil & Gas, Inc.Jan 1993 → Dec 1994
- 2Holden Oil and GasJan 1996 → Jul 2002
- 3Tri-Tex Exploration LtdAug 2002 → Jul 2010
- 4Quantum InvestmentsAug 2010 → Aug 2010
- 5D.J. & T. EnergySep 2010 → May 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 97350-99 | Drill | King, Frank J | Oct 28, 1980 | Oct 28, 1980 | Dec 8, 1980 | 3,510 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-16615 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,834 | 1,841 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 132 | 11 | 100 S |
| 4.5 | 3,504 | 7.875 | 250 S |
| 2.375 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Mar 26, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-33570 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-33570 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41733570, documented in the API reference.