WELL · 42-417-34343 · DISTRICT 7

Blackburn #2

Plugged

Shackelford County · Pannell S. (Strawn) field  · Vertical

Blackburn #2 (API 42-417-34343) is a plugged well in Shackelford County, plugged April 5, 2017, last operated by Van Operating Ltd..

The RRC has issued 2 drilling permits between 1982 and 2003, permitted to 4,800 ft.

Completion filings report 7 formation tops, including T/Gardner, Caddo, T/Caddo, Chester.

Its 2 leases have reported 85.9K barrels of oil and 74.9K mcf of gas since January 1993, last reporting in May 2022. The leases carry 21 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Albany, TX · P-5 Inactive, filed Jan 28, 2021 · 96 permits on file · (325) 762-3353

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Apr 2016
Latest permitVan Operating, Ltd.Mar 6, 2003
4,800
total depth, ft
2
permits on file
Mar 6, 2003
last permit issued
Jun 21, 2003
completed
85.9K
cumulative oil, bbl
74.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 21, 2003
Shut in
—
Plugged
Apr 5, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 21 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blackburn O-8-19783Pannell, S. (Strawn)Van Operating, Ltd.1385.9K74.9KJan 1993 – May 2022
Blackburn O-8-17429Marsha (Ellen)Van Operating, Ltd.800Jan 1993 – Apr 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Jan 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
528960-99RecompletionVan Operating, Ltd.Feb 27, 2003Mar 6, 2003Sep 22, 19934,308
151438-99DrillJones Co.Feb 16, 1982Feb 16, 1982—4,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-17429————
—— O-8-19783————

Formation tops

As filed on W-2/G-1. Subsea from 1,507 ft elevation.Download CSV →

FormationMD ftSubsea
T/Gardner3,053-1,546
Caddo3,745-2,238
T/Caddo3,745-2,238
Chester4,284-2,777
T/Chester4,284-2,777
Ellen4,338-2,831
T/Ellen4,338-2,831

Perforations

Perforated and open-hole intervals.

FromToType
3,0673,072Perforated
4,3764,380Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510612.2590 S
4.54,3167.875305 S
2.3754,348——
4.54,3767.875180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2003Sep 8, 2003—
00Jun 9, 2003Feb 24, 2003Yes
00May 27, 2003——
00Jan 12, 1984Mar 6, 1982Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
685K
bbl, all reported
Jun 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093104H-1 InjectionPlugged May 9, 20175001,5003,067–3,072

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 10,574(-100%)

05001K1.5K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41734343, documented in the API reference.