WELL · 42-417-34535 · DISTRICT 7
Bernstein #1
Shackelford County · Sanders-Burchard (Miss) field · Vertical
Bernstein #1 (API 42-417-34535) is a plugged well in Shackelford County, plugged June 27, 1995, last operated by Dynamic Production Inc..
The RRC has issued 2 drilling permits between 1982 and 1985, permitted to 4,700 ft.
It was permitted by Raw Energy Corporation and has since transferred to Dynamic Production Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Mississippian, Ellenburger.
Operator of record
Permitted by Raw Energy Corporation; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Jan 4, 2026 · 276 permits on file · (817) 291-4410
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dynamic Production Inc. |
| Production reports | none |
| Latest permit | Raw Energy CorporationSep 6, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,700
- total depth, ft
- 2
- permits on file
- Sep 6, 1985
- last permit issued
- Apr 18, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 18, 1985
- Shut in
- —
- Plugged
- Jun 27, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bernstein O-8-23073 | Sanders-Burchard (Miss) | Dynamic Production, Inc. | 1 | 0 | 0 | Jan 1993 – Sep 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 284681-99 | Recompletion | Raw Energy Corporation | May 6, 1985 | Sep 6, 1985 | — | 4,500 |
| 170674-99 | Drill | Raw Energy Corporation | Aug 19, 1982 | Aug 19, 1982 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-23073 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,336 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 3,950 | -2,614 |
| MississippianMISSISSIPPI | 4,460 | -3,124 |
| Ellenburger | 4,565 | -3,229 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,460 | 4,466 | Perforated |
| 4,568 | 4,576 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 143 | 12.25 | 100 S |
| 8.625 | 143 | 12.5 | 100 S |
| 2.375 | 4,550 | — | — |
| 4.5 | 4,568 | 7.875 | 180 S |
| 4.5 | 4,568 | — | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 6, 1985 | Apr 30, 1985 | — |
| 00 | Nov 1, 1985 | — | — |
| 00 | Jan 12, 1984 | Dec 9, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-34535 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-34535 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41734535, documented in the API reference.