WELL · 42-417-35187 · DISTRICT 7

Rogers #3

Y

Shackelford County · Royall (Ellenburger) field · Injection  · Vertical

Rogers #3 (API 42-417-35187) is a well in Shackelford County operated by Petex, completed June 23, 1983 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 2, 1983, permitted to 4,200 ft.

It was permitted by Grothe Bros. and has since transferred to Petex on the wellbore schedule.

Completion filings report 4 formation tops, including Morrison Limestone, Strawn, Caddo, Ellenburger.

Its lease has reported 1.84K barrels of oil and 31.6K mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 51.1K barrels injected in the 12 months reported through June 2025.

Operator of record

Petex

Permitted by Grothe Bros.; the EWA schedule now lists a different operator.

Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetex
Production reportsPetexthrough Mar 2016
Latest permitGrothe Bros.Jun 2, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,200
total depth, ft
1
permits on file
Jun 2, 1983
last permit issued
Jun 23, 1983
completed
1.84K
cumulative oil, bbl
31.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 23, 1983
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rogers O-8-20137Royall (Ellenburger)Petex41.84K31.6KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Grothe Bros.Jan 1993 → May 2002
  2. 2Grothe, M. L. Oil Co.Sep 2002 → Jun 2010
  3. 3M.L. Grothe Corp.Jul 2010 → Oct 2011
  4. 4Grothe, M.L. Est.Jul 2012 → Jul 2013
  5. 5PetexAug 2014 → Mar 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
196981-99DrillGrothe Bros.Jun 2, 1983Jun 2, 1983—4,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-20137————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Morrison Limestone1,998
Strawn2,860
CaddoTOP CADDO3,450
Ellenburger4,042

Perforations

Perforated and open-hole intervals.

FromToType
4,0424,056Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253208.625175 S
8.62532011.25175 S
5.54,0407.875150 S
2.3754,040——
5.54,0427.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 23, 1985Aug 12, 1985—
00Jan 12, 1984Aug 12, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

51.1K
bbl, last 12 reported months
744K
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057252H-1 InjectionActive004,042–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 51,102 · prior 12 51,387(-1%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41735187, documented in the API reference.