WELL · 42-417-35205 · DISTRICT 7
Beck #1
Shackelford County · Jasper-Glahn (Bend) field · Vertical
Beck #1 (API 42-417-35205) is a plugged well in Shackelford County, plugged November 25, 1987, last operated by Pittencrieff America Inc..
The RRC has issued 2 drilling permits between 1983 and 1986, permitted to 5,010 ft.
It was permitted by Jasper Exploration Inc. and has since transferred to Pittencrieff America Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Base Coleman Jct, Base Hope Lime, Palo Pinto.
Operator of record
Permitted by Jasper Exploration Inc.; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Aug 2, 2002 · 111 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pittencrieff America Inc. |
| Production reports | none |
| Latest permit | Jasper Exploration Inc.Sep 11, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,010
- total depth, ft
- 2
- permits on file
- Sep 11, 1986
- last permit issued
- Jul 12, 1983
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 12, 1983
- Shut in
- —
- Plugged
- Nov 25, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 320260-99 | Recompletion | Jasper Exploration Inc. | Sep 8, 1986 | Sep 11, 1986 | — | 5,010 |
| 198455-99 | Drill | Jasper Exploration Inc. | Jun 16, 1983 | Jun 16, 1983 | — | 5,000 |
Formation tops
As filed on W-2/G-1. Subsea from 1,604 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Coleman JCT | 1,125 | 479 |
| Base Hope Lime | 1,840 | -236 |
| Palo PintoTOP PALO PINTO | 3,150 | -1,546 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,374 | 3,380 | Perforated |
| 3,434 | 3,440 | Perforated |
| 4,917 | 4,927 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 11 | 70 S |
| 2.375 | 4,873 | — | — |
| 4.5 | 4,994 | 7.875 | 485 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 10, 1986 | Sep 30, 1986 | Yes |
| 00 | Oct 3, 1986 | — | — |
| 00 | Jan 12, 1984 | Jul 28, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-35205 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-35205 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41735205, documented in the API reference.