WELL · 42-417-35547 · DISTRICT 7

Matthews 13B #2B

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Matthews 13b #2B (API 42-417-35547) is a plugged well in Shackelford County, plugged June 5, 2007, last operated by 5 Schkade.

The RRC has issued one drilling permit, issued October 18, 1983, permitted to 1,900 ft.

It was permitted by Jones CO. and has since transferred to 5 Schkade on the wellbore schedule.

Completion filings report 6 formation tops, including T/Stockwether, T/Tannehill, T/T/Hill, T/Saddle Creek.

Its lease has reported 6.9K barrels of oil and 142 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

5 Schkade

Permitted by Jones Co.; the EWA schedule now lists a different operator.

Albany, TX · P-5 Y, filed Jun 4, 2026 · 4 permits on file · (713) 202-5525

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule5 Schkade
Production reports5 Schkadethrough Jun 2018
Latest permitJones Co.Oct 18, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,900
total depth, ft
1
permits on file
Oct 18, 1983
last permit issued
Nov 18, 1991
completed
6.9K
cumulative oil, bbl
142
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 18, 1991
Shut in
—
Plugged
Jun 5, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Matthews "13B" O-8-20668Shackelford County Regular5 Schkade46.9K142Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1C & L EquipmentJan 1993 → Jan 1993
  2. 2CDJ Oil Co.Feb 1993 → Dec 2010
  3. 35 SchkadeJan 2011 → Jun 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
217376-99DrillJones Co.Mar 22, 1984Oct 18, 1983—1,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-20668————

Formation tops

As filed on W-2/G-1. Subsea from 1,779 ft elevation.Download CSV →

FormationMD ftSubsea
T/Stockwether1,171608
T/Tannehill1,222557
T/T/Hill1,222557
T/Saddle Creek1,264515
T/Saddlecreek1,264515
B/Coal1,306473

Perforations

Perforated and open-hole intervals.

FromToType
1,2241,232Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510912.2590 S
4.51,3177.87550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 1992Jan 3, 1992—
00Mar 25, 1987Feb 25, 1987Yes
00Mar 10, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

445
bbl, last 12 reported months
16.2K
bbl, all reported
Jul 2007
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000076212H-1 InjectionPlugged Jul 2, 20073006001,224–1,232

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 445 · prior 12 695(-36%)

020406020062007

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41735547, documented in the API reference.