WELL · 42-417-35572 · DISTRICT 7

Miller Morris #5

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Miller Morris #5 (API 42-417-35572) is a plugged well in Shackelford County, plugged May 9, 2008, last operated by Dino Operating LLC.

The RRC has issued one drilling permit, issued November 9, 1983, permitted to 2,000 ft.

It was permitted by Albany Well Service and has since transferred to Dino Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Tannehill, Saddle Creek, Bluff Creek.

Its lease has reported 7.03K barrels of oil and 141 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Dino Operating LLC

Permitted by Albany Well Service; the EWA schedule now lists a different operator.

Throckmorton, TX · P-5 Y, filed Nov 4, 2025 · (325) 261-1880

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDino Operating LLC
Production reportsP.B. Blue Dot Propertiesthrough Sep 2009
Latest permitAlbany Well ServiceNov 9, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Nov 9, 1983
last permit issued
Jan 25, 1984
completed
7.03K
cumulative oil, bbl
141
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 25, 1984
Shut in
—
Plugged
May 9, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller, Morris O-8-17641Shackelford County RegularDino Operating LLC57.03K141Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Albany Well ServiceJan 1993 → Aug 2005
  2. 2P.B. Blue Dot PropertiesSep 2005 → Sep 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
220280-99DrillAlbany Well ServiceNov 7, 1983Nov 9, 1983Jan 15, 19842,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-17641————

Formation tops

As filed on W-2/G-1. Subsea from 1,669 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill1,498171
Saddle Creek1,57693
Bluff Creek1,60663

Perforations

Perforated and open-hole intervals.

FromToType
1,4651,468Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251011190 S
5.51,5677.87595 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 2, 1986Aug 11, 1986Yes
00Aug 22, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
32.7K
bbl, all reported
Jul 2008
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000057227H-1 InjectionPlugged May 28, 2008001,465–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 1,281(-100%)

05010015020072008

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41735572, documented in the API reference.