WELL · 42-417-35898 · DISTRICT 7

Nail B-9 #6

N

Shackelford County · Shackelford County Regular (Gas) field  · Vertical

Nail B-9 #6 (API 42-417-35898) is a well in Shackelford County operated by Rampart Petroleum Incorporated, completed August 8, 1984.

The RRC has issued one drilling permit, issued July 17, 1984, permitted to 1,000 ft.

Completion filings report one formation top, including Cook.

Its lease has reported 563 barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Rampart Petroleum Incorporated

Buffalo Gap, TX · P-5 Y, filed Jun 8, 2012 · 43 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRampart Petroleum Incorporated
Production reportsClavo Oil, LLCthrough May 2012
Latest permitRampart Petroleum, IncorporatedJul 17, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
1
permits on file
Jul 17, 1984
last permit issued
Aug 8, 1984
completed
563
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 8, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail B-9 (Shallow) O-8-22186Shackelford County RegularM & K Operating LLC156336Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Frontier Operating CorporationJan 1993 → May 2001
  2. 2B P Operating CompanyJun 2001 → Dec 2002
  3. 3Boo-Row Pipe & Supply, Inc.May 2003 → Mar 2006
  4. 4Clavo Oil, LLCApr 2006 → May 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245288-99DrillRampart Petroleum, IncorporatedJul 17, 1984Jul 17, 1984—1,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-22186————

Formation tops

As filed on W-2/G-1. Subsea from 1,336 ft elevation.Download CSV →

FormationMD ftSubsea
Cook954382

Perforations

Perforated and open-hole intervals.

FromToType
956958Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,0247.875285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 1985Feb 21, 1985—
00Mar 21, 1985——
00Nov 6, 1984Sep 28, 1984—
00Oct 27, 1984Aug 14, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41735898, documented in the API reference.