WELL · 42-417-36064 · DISTRICT 7

Davis Merrick #10

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Davis Merrick #10 (API 42-417-36064) is a plugged well in Shackelford County, plugged May 8, 2018, last operated by Schkade Production CO..

The RRC has issued one drilling permit, issued November 28, 1984, permitted to 1,975 ft.

It was permitted by Schkade Bros. Operating Company and has since transferred to Schkade Production CO. on the wellbore schedule.

Completion filings report 5 formation tops, including Dothan Lm, Saddle Creek, Bluff Creek Sand, Crystal Falls Lm.

Its lease has reported 110K barrels of oil and 34 mcf of gas since January 1993, last reporting in July 2020. The lease carries 14 wells, so these are lease totals, not this well alone.

Operator of record

Schkade Production Co.

Permitted by Schkade Bros. Operating Company; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jun 5, 2020 · 1 permits on file · (325) 668-7367

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSchkade Production Co.
Production reportsSchkade Production Co.through Sep 2017
Latest permitSchkade Bros. Operating CompanyNov 28, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,975
total depth, ft
1
permits on file
Nov 28, 1984
last permit issued
Jun 16, 1995
completed
110K
cumulative oil, bbl
34
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 16, 1995
Shut in
—
Plugged
May 8, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, Merrick O-8-3183Shackelford County RegularSchkade Production Co.14110K34Jan 1993 – Jul 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Schkade Bros. Operating CompanyJan 1993 → Aug 2002
  2. 2Schkade Production Co.Sep 2002 → Sep 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
259235-99DrillSchkade Bros. Operating CompanyNov 28, 1984Nov 28, 1984—1,975

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-3183————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Dothan LM1,298
Saddle Creek1,621
Bluff Creek Sand1,626
Bluff Creek Sand1,627
Crystal Falls LM1,823
Breckenridge LM1,851

Perforations

Perforated and open-hole intervals.

FromToType
1,6271,630Perforated
1,6281,631Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,7066.75240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 1996Jun 28, 1995—
00Feb 19, 1985Jan 22, 1985—
00Feb 9, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

17.1K
bbl, last 12 reported months
382K
bbl, all reported
Jul 2017
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083045H-1 InjectionPlugged May 18, 20185008101,627–1,630

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 17,055 · prior 12 17,000(+0%)

05001K1.5K20162017

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41736064, documented in the API reference.