WELL · 42-417-36106 · DISTRICT 7

Dawson Conway Ranch 203 C #18

Plugged

Shackelford County · J.B. (Bluff Creek) field  · Vertical

Dawson Conway Ranch 203 C #18 (API 42-417-36106) is a plugged well in Shackelford County, plugged January 31, 2008, last operated by Rigged UP LLC.

The RRC has issued one drilling permit, issued December 21, 1984, permitted to 2,000 ft.

It was permitted by Morrell, W. R. and has since transferred to Rigged UP LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Saddle Creek, Bluff Creek Sand, Flippen Lime.

Its lease has reported 42.2K barrels of oil and 36 mcf of gas since January 1993, last reporting in July 2026. The lease carries 22 wells, so these are lease totals, not this well alone.

Operator of record

Rigged UP LLC

Permitted by Morrell, W. R.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Apr 4, 2026 · (940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRigged UP LLC
Production reportsOrland Oil & Gas LLCthrough Jan 2021
Latest permitMorrell, W. R.Dec 21, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Dec 21, 1984
last permit issued
Jun 26, 1985
completed
42.2K
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 1985
Shut in
—
Plugged
Jan 31, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 22 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dawson Conway Ranch 203 C O-8-15289J.B. (Bluff Creek)Rigged UP, LLC2242.2K36Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Frontier Operating CorporationJan 1993 → Dec 1999
  2. 2B P Operating CompanyJan 2000 → Jun 2007
  3. 3Barton Oil Co.Dec 2002 → Aug 2003
  4. 4M & K Operating LLCApr 2008 → Jun 2014
  5. 5Bluff Creek Operating, LLCJul 2014 → Jun 2016
  6. 6Orland Oil & Gas LLCJul 2016 → Jan 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
262022-99DrillMorrell, W. R.Dec 19, 1984Dec 21, 1984Jun 19, 19852,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-15289————

Formation tops

As filed on W-2/G-1. Subsea from 1,668 ft elevation.Download CSV →

FormationMD ftSubsea
Saddle CreekSADDLE CREEK LIME1,61058
Bluff Creek Sand1,62444
Flippen Lime1,6608

Perforations

Perforated and open-hole intervals.

FromToType
1,6241,626Perforated
1,6331,635Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510012.2560 S
4.51,6907.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 7, 1986Jul 11, 1986—
00Jul 31, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
510K
bbl, all reported
Jun 2008
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000058773H-1 InjectionPlugged Feb 5, 20081508001,624–1,635

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120072008

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41736106, documented in the API reference.