WELL · 42-417-36455 · DISTRICT 7

Davis Louie Bob et AL #24

Plugged

Shackelford County · Petranol (Bluff Creek) field  · Vertical

Davis Louie Bob ET AL #24 (API 42-417-36455) is a plugged well in Shackelford County, plugged June 10, 1998, last operated by Ngezi Lcc.

The RRC has issued one drilling permit, issued August 2, 1985, permitted to 1,950 ft.

It was permitted by Nueve Operating CO. Of Texas and has since transferred to Ngezi Lcc on the wellbore schedule.

Completion filings report 3 formation tops, including Stockwether Lime, Bluff Creek Sand, Top Bluff Creek.

Its lease has reported 12.3K barrels of oil and 29 mcf of gas since January 1993, last reporting in July 2026. The lease carries 25 wells, so these are lease totals, not this well alone.

Operator of record

Ngezi LCC

Permitted by Nueve Operating Co. of Texas; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Jan 5, 2007

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNgezi LCC
Production reportsNgezi, LCCthrough Sep 1996
Latest permitNueve Operating Co. of TexasAug 2, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,950
total depth, ft
1
permits on file
Aug 2, 1985
last permit issued
Feb 24, 1986
completed
12.3K
cumulative oil, bbl
29
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 24, 1986
Shut in
—
Plugged
Jun 10, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 25 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, Louie Bob et AL O-8-21408Petranol (Bluff Creek)Ngezi, LCC2512.3K29Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kelt Oil & Gas, Inc.Jan 1993 → May 1995
  2. 2Ngezi, LCCJun 1995 → Sep 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
281592-99DrillNueve Operating Co. of TexasJul 18, 1985Aug 2, 1985—1,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-21408————

Formation tops

As filed on W-2/G-1. Subsea from 1,765 ft elevation.Download CSV →

FormationMD ftSubsea
Stockwether Lime1,540225
Bluff Creek Sand1,606159
Top Bluff Creek1,606159

Perforations

Perforated and open-hole intervals.

FromToType
1,6081,616Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.51,7647.875335 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 4, 1986Nov 18, 1986—
00Oct 31, 1985Oct 17, 1985Yes
00Oct 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
237K
bbl, all reported
Apr 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000060449H-1 InjectionPlugged Jun 29, 199807851,608–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 31,213(-100%)

02K4K19941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41736455, documented in the API reference.