WELL · 42-417-36883 · DISTRICT 7
Chaney C.B. #1
Shackelford County · Ken Rose (Lo. Congl.) field · Vertical
Chaney C.B. #1 (API 42-417-36883) is a plugged well in Shackelford County, plugged April 20, 2023, last operated by Royal Texan Energy CO..
The RRC has issued one drilling permit, issued May 8, 1986, permitted to 4,250 ft.
It was permitted by Lentex Petroleum Industries, Inc and has since transferred to Royal Texan Energy CO. on the wellbore schedule.
Completion filings report 4 formation tops, including Moran Sand, Jennings Sand, Lower Gardner Sd, Caddo.
Operator of record
Permitted by Lentex Petroleum Industries, Inc; the EWA schedule now lists a different operator.
Irvine, CA · P-5 Y, filed Jul 4, 2026 · 6 permits on file · (254) 246-0389
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Royal Texan Energy Co. |
| Production reports | Leonard Brothers Operating Co.through May 2006 |
| Latest permit | Lentex Petroleum Industries, IncMay 8, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,250
- total depth, ft
- 1
- permits on file
- May 8, 1986
- last permit issued
- May 26, 1986
- completed
- 0
- cumulative oil, bbl
- 9.56K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 26, 1986
- Shut in
- —
- Plugged
- Apr 20, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chaney, C.B. G-8-121547 | Ken Rose (Lo. Congl.) | Royal Texan Energy Co. | 1 | 0 | 9.56K | Jan 1993 – Apr 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Davis EnterprisesJan 1993 → Sep 1994
- 2Leonard Brothers Operating Co.Oct 1994 → May 2006
- 3Lillis, Michael D.Sep 1997 → Feb 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 301948-99 | Drill | Lentex Petroleum Industries, Inc | May 7, 1986 | May 8, 1986 | — | 4,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-121547 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,389 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Moran Sand | 1,968 | -579 |
| Jennings Sand | 2,534 | -1,145 |
| Lower Gardner SD | 2,790 | -1,401 |
| CaddoCADDO LIME | 3,612 | -2,223 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,829 | 3,831 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 120 | 12.25 | 90 S |
| 4.5 | 3,903 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 1986 | Jun 19, 1986 | Yes |
| 00 | Jul 3, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-36883 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-36883 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41736883, documented in the API reference.