WELL · 42-417-37247 · DISTRICT 7

Davis Estate 80 #3

Plugged

Shackelford County · Windy (Tannehill) field  · Vertical

Davis Estate 80 #3 (API 42-417-37247) is a plugged well in Shackelford County, plugged October 28, 2025, last operated by Global Drilling LLC.

The RRC has issued one drilling permit, issued March 8, 1989, permitted to 2,000 ft.

It was permitted by Tracker Mineral and has since transferred to Global Drilling LLC on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Its lease has reported 13.9K barrels of oil and 5.1K mcf of gas since January 1993, last reporting in March 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Global Drilling LLC

Permitted by Tracker Mineral; the EWA schedule now lists a different operator.

N Richlnd HLS, TX · P-5 Y, filed Feb 4, 2026 · 5 permits on file · (817) 946-2374

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGlobal Drilling LLC
Production reportsGlobal Drilling, LLCthrough Jul 2025
Latest permitTracker MineralMar 8, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,000
total depth, ft
1
permits on file
Mar 8, 1989
last permit issued
Aug 18, 2017
completed
13.9K
cumulative oil, bbl
5.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 2017
Shut in
—
Plugged
Oct 28, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis Estate "80" O-8-24008Windy (Tannehill)Global Drilling, LLC413.9K5.1KJan 1993 – Mar 2026

Oil, barrels lease total

Last 12 months 21 · prior 12 143(-85%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tracker MineralJan 1993 → Jun 1996
  2. 2Continual Oil & Gas, Inc.Jul 1996 → Feb 1998
  3. 3BC Operating, Inc.Mar 1998 → Aug 2004
  4. 4Crownquest Operating, LLCJan 2000 → Jul 2001
  5. 5TSW Oil & Gas, LLCJun 2015 → Dec 2015
  6. 6Global Drilling, LLCJul 2017 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356723-99DrillTracker MineralMar 6, 1989Mar 8, 1989—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-24008————

Formation tops

As filed on W-2/G-1. Subsea from 1,907 ft elevation.Download CSV →

FormationMD ftSubsea
Tannehill1,507400

Perforations

Perforated and open-hole intervals.

FromToType
1,5121,515Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251001160 S
4.51,5676.75150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 24, 2017Sep 28, 2017—
00Aug 12, 2008Feb 1, 2008—
00Jun 19, 1989Apr 21, 1989Yes
00Jun 9, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.3K
bbl, last 12 reported months
231K
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074926H-1 InjectionPlugged Nov 18, 20253007501,512–1,515

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,300 · prior 12 3,655(-37%)

020040020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737247, documented in the API reference.