WELL · 42-417-37305 · DISTRICT 7
Hendrick 75B #5
Shackelford County · Shackelford County Regular field · Producing · Vertical
Hendrick 75b #5 (API 42-417-37305) is a well in Shackelford County operated by Petex, completed August 21, 1989 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued August 18, 1989, permitted to 1,999 ft.
It was permitted by Jacobs, C. E., CO. and has since transferred to Petex on the wellbore schedule.
Completion filings report 5 formation tops, including Dothan Ls, Saddle Creek, Flippen Ss, Breckenridge Ls.
Its lease has reported 75K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Jacobs, C. E., Co.; the EWA schedule now lists a different operator.
Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petex |
| Production reports | Petexthrough Apr 2026 |
| Latest permit | Jacobs, C. E., Co.Aug 18, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- Aug 18, 1989
- last permit issued
- Aug 21, 1989
- completed
- 75K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 21, 1989
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hendrick 75B O-8-14201 | Shackelford County Regular | Petex | 4 | 75K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 705 · prior 12 891(-21%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jacobs, C. E., Co.Jan 1993 → Sep 2022
- 2PetexOct 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 362813-99 | Drill | Jacobs, C. E., Co. | Aug 16, 1989 | Aug 18, 1989 | — | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-14201 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,494 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dothan LS | 1,016 | 478 |
| Saddle CreekSADDLE CREEK LS | 1,307 | 187 |
| Flippen SS | 1,354 | 140 |
| Breckenridge LS | 1,581 | -87 |
| L/Swastika SS | 1,713 | -219 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,402 | 1,410 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 131 | 11 | 100 S |
| 4.5 | 1,663 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 27, 1989 | Aug 30, 1989 | Yes |
| 00 | Sep 19, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-37305 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-37305 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41737305, documented in the API reference.