WELL · 42-417-37325 · DISTRICT 7
Nail 153 #1
Shackelford County · Whistler Bend (Caddo) field · Vertical
Nail 153 #1 (API 42-417-37325) is a plugged well in Shackelford County, plugged January 9, 2003, last operated by Jacobs C. E. CO..
The RRC has issued 2 drilling permits between 1989 and 1992, permitted to 5,100 ft.
Completion filings report 7 formation tops, including B/Coleman Jct Ls, B/Coleman Jctls, Breckenridge Ls, Strawn.
Operator of record
Albany, TX · P-5 Y, filed Mar 6, 2023 · 356 permits on file · (325) 668-8169
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jacobs C. E. Co. |
| Production reports | Jacobs, C. E., Co.through Jan 1993 |
| Latest permit | Jacobs, C. E., Co.Jan 27, 1992 |
- 5,100
- total depth, ft
- 2
- permits on file
- Jan 27, 1992
- last permit issued
- Mar 6, 1990
- completed
- 0
- cumulative oil, bbl
- 65
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 6, 1990
- Shut in
- —
- Plugged
- Jan 9, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail 153 O-8-27246 | Shackelford County Regular | Jacobs, C. E., Co. | 1 | 0 | 0 | Jul 1994 – Mar 2003 |
| Nail 153 G-8-133860 | Whistler Bend (Caddo) | Jacobs, C. E., Co. | 1 | 0 | 65 | Jan 1993 – Oct 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Jacobs, C. E., Co.Jan 1993 → Jan 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 396039-99 | Recompletion | Jacobs, C. E., Co. | Jan 22, 1992 | Jan 27, 1992 | Apr 16, 1992 | 1,800 |
| 364948-99 | Drill | Jacobs, C. E., Co. | Oct 10, 1989 | Oct 12, 1989 | — | 5,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-133860 | — | — | — | — |
| — | — O-8-27246 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,607 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman JCT LS | 838 | 769 |
| B/Coleman Jctls | 838 | 769 |
| Breckenridge LS | 1,672 | -65 |
| Strawn | 3,353 | -1,746 |
| StrawnSTRAWN LS | 3,353 | -1,746 |
| CaddoCADDO LS | 4,623 | -3,016 |
| BendBEND CGL | 4,977 | -3,370 |
| MississippianMISS CHESTER LS | 5,024 | -3,417 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,437 | 1,443 | Perforated |
| 4,749 | 4,756 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 100 | 12.25 | 80 S |
| 4.5 | 1,736 | 7.875 | 125 S |
| 4.5 | 4,230 | 7.875 | 125 S |
| 4.5 | 5,055 | 7.875 | 140 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 4, 1994 | Aug 8, 1994 | Yes |
| 00 | Aug 19, 1994 | — | — |
| 00 | Apr 6, 1990 | Mar 30, 1990 | Yes |
| 00 | Apr 4, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-37325 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-37325 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41737325, documented in the API reference.