WELL · 42-417-37387 · DISTRICT 7

Hendrick 74C #5

Y

Shackelford County · Shackelford County Regular field · Injection  · Vertical

Hendrick 74c #5 (API 42-417-37387) is a well in Shackelford County operated by Petex, completed July 12, 1990 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued May 1, 1990, permitted to 1,999 ft.

It was permitted by Jacobs, C. E., CO. and has since transferred to Petex on the wellbore schedule.

Completion filings report 5 formation tops, including Coleman Jct Ls, Dothan Ls, Saddle Creek, Coal.

Its lease has reported 20.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 29.3K barrels injected in the 12 months reported through July 2025.

Operator of record

Petex

Permitted by Jacobs, C. E., Co.; the EWA schedule now lists a different operator.

Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetex
Production reportsPetexthrough Apr 2026
Latest permitJacobs, C. E., Co.May 1, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
May 1, 1990
last permit issued
Jul 12, 1990
completed
20.8K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hendrick 74C O-8-12384Shackelford County RegularPetex320.8K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 30 · prior 12 47(-36%)

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jacobs, C. E., Co.Jan 1993 → Sep 2022
  2. 2PetexOct 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
372700-99DrillJacobs, C. E., Co.Apr 27, 1990May 1, 1990Jun 19, 19901,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-12384————

Formation tops

As filed on W-2/G-1. Subsea from 1,475 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JCT LS706769
Dothan LS1,008467
Saddle CreekSADDLE CREEK LS1,302173
Coal1,375100
Breckenridge LS1,576-101

Perforations

Perforated and open-hole intervals.

FromToType
1,3851,391Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.2590 S
5.51,5907.875110 S
4.51,5907.875110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 8, 2006Dec 2, 2005—
00Mar 1, 1991Jan 22, 1991Yes
00Feb 11, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

29.3K
bbl, last 12 reported months
526K
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081866H-1 InjectionActive1,0006751,384–1,391

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 29,274 · prior 12 31,767(-8%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737387, documented in the API reference.