WELL · 42-417-37743 · DISTRICT 7

Nail 136 #1S

Y

Shackelford County · Shackelford County Regular field · Injection  · Vertical

Nail 136 #1S (API 42-417-37743) is a well in Shackelford County operated by Bluff Creek Petroleum LLC, completed April 25, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 22, 1993, permitted to 1,999 ft.

It was permitted by Breck Operating Corp. and has since transferred to Bluff Creek Petroleum LLC on the wellbore schedule.

Completion filings report 2 formation tops, including L. Tannehill, Flippen Sand.

Its lease has reported 19.5K barrels of oil and 1.04K mcf of gas since January 1994, last reporting in July 2026.

It holds an active disposal or injection permit, with 6.84K barrels injected in the 12 months reported through July 2025.

Operator of record

Bluff Creek Petroleum LLC

Permitted by Breck Operating Corp.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Mar 4, 2026 · 117 permits on file · (325) 668-7848

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBluff Creek Petroleum LLC
Production reportsFTC Consulting, LLCthrough Mar 2020
Latest permitBreck Operating Corp.Sep 22, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,999
total depth, ft
1
permits on file
Sep 22, 1993
last permit issued
Apr 25, 2022
completed
19.5K
cumulative oil, bbl
1.04K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 25, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail "136" O-8-27090Shackelford County RegularBluff Creek Petroleum, LLC119.5K1.04KJan 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Breck Operating Corp.Jan 1994 → Jan 2003
  2. 2Boo-Row Pipe & Supply, Inc.Feb 2003 → Mar 2006
  3. 3Clavo Oil, LLCApr 2006 → Aug 2017
  4. 4FTC Consulting, LLCSep 2017 → Mar 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
416100-99DrillBreck Operating Corp.Sep 16, 1993Sep 22, 1993Nov 24, 19931,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-27090————

Formation tops

As filed on W-2/G-1. Subsea from 1,696 ft elevation.Download CSV →

FormationMD ftSubsea
L. Tannehill1,300396
Flippen Sand1,500196

Perforations

Perforated and open-hole intervals.

FromToType
1,5001,504Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625406.75—
4.51,7016.75250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 30, 2022Apr 25, 2022—
00Mar 3, 1994Jan 31, 1994Yes
00Feb 8, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

6.84K
bbl, last 12 reported months
23K
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124913H-1 InjectionActive4007501,500–1,510

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 6,840 · prior 12 7,365(-7%)

05001K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737743, documented in the API reference.