WELL · 42-417-37808 · DISTRICT 7

McLemore A-232 #4D

Y

Shackelford County · Shackelford County Regular (Gas) field · Producing  · Vertical

Mclemore A-232 #4D (API 42-417-37808) is a well in Shackelford County operated by Shaida John H., completed May 9, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued April 13, 1994, permitted to 4,000 ft.

It was permitted by Throckmorton Oil, Inc. and has since transferred to Shaida John H. on the wellbore schedule.

Completion filings report one formation top, including Strawn.

No lease production has been reported under this well’s leases.

Operator of record

Shaida John H.

Permitted by Throckmorton Oil, Inc.; the EWA schedule now lists a different operator.

Wichita, KS · P-5 Y, filed May 4, 2026 · 3 permits on file · (316) 636-2525

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShaida John H.
Production reportsShaida, John H.through Apr 2026
Latest permitThrockmorton Oil, Inc.Apr 13, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
3
permits on file
Apr 13, 1994
last permit issued
May 9, 1994
completed
0
cumulative oil, bbl
95.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 9, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McLemore A-232 G-8-152239Shackelford County Regular (Gas)Shaida, John H.1095.1KMay 1994 – Jul 2026

Gas, mcf lease total

Last 12 months 1,902 · prior 12 1,468(+30%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Throckmorton Oil, Inc.Jun 1994 → Mar 1996
  2. 2Unit Petroleum CompanyApr 2006 → Feb 2017
  3. 3Shaida, John H.Mar 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422929-97DrillThrockmorton Oil, Inc.Sep 2, 1994Apr 13, 1994Apr 15, 19944,000
422929-98DrillThrockmorton Oil, Inc.Aug 19, 1994Apr 13, 1994—4,000
422929-99DrillThrockmorton Oil, Inc.Apr 12, 1994Apr 13, 1994—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-152239————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Strawn3,202

Perforations

Perforated and open-hole intervals.

FromToType
3,2023,206Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62527912.25162 S
4.53,6227.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 7, 1995Jun 17, 1994Yes
00Jan 10, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083865W-14 DisposalNot activated5001,1002,250–2,270

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737808, documented in the API reference.