WELL · 42-417-37846 · DISTRICT 7

Walker-Buckler C #2

Plugged

Shackelford County · Sonny (Caddo) field  · Vertical

Walker-Buckler C #2 (API 42-417-37846) is a plugged well in Shackelford County, plugged November 21, 2014, last operated by Van Operating Ltd..

The RRC has issued 2 drilling permits (amended once) between 1994 and 1996, permitted to 4,800 ft.

Completion filings report 7 formation tops, including Strawn, T/Strawn, Caddo, T/Caddo.

Its 2 leases have reported 28.1K barrels of oil and 47.3K mcf of gas since April 1993, last reporting in July 2015. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Albany, TX · P-5 Y, filed Dec 10, 2021 · 96 permits on file · (325) 725-4542

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Dec 1999
Latest permitVan Operating, Ltd.May 6, 1996
4,800
total depth, ft
3
permits on file
May 6, 1996
last permit issued
Apr 26, 1995
completed
28.1K
cumulative oil, bbl
47.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Jul 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 26, 1995
Shut in
—
Plugged
Nov 21, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walker-Buckler "C" O-8-26865Sheri (Caddo)Van Operating, Ltd.228.1K29.5KApr 1993 – Jul 2015
Walker-Buckler "C" G-8-152342Sonny (Caddo)Van Operating, Ltd.1017.7KNov 1994 – Apr 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Apr 1993 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Dec 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
447560-99RecompletionVan Operating, Ltd.Apr 26, 1996May 6, 1996Apr 2, 19964,555
426374-98DrillJones Company, Ltd.Dec 19, 1994Aug 1, 1994Oct 13, 19944,555
426374-99DrillJones Company, Ltd.Jul 28, 1994Aug 1, 1994—4,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-152342————
—— O-8-26865————

Formation tops

As filed on W-2/G-1. Subsea from 1,278 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn2,928-1,650
T/Strawn2,928-1,650
Caddo3,876-2,598
T/Caddo3,876-2,598
Caddo4,060-2,782
L. Caddo4,060-2,782
T/L. Caddo4,060-2,782
B/Caddo4,254-2,976

Perforations

Perforated and open-hole intervals.

FromToType
3,8874,111Perforated
3,9113,922Perforated
4,0704,078Perforated
4,1064,111Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62567212.25320 S
4.54,5547.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 2, 2001Jun 12, 2000—
00Jun 14, 1996Apr 29, 1996Yes
00May 31, 1996—Yes
00May 24, 1995May 4, 1995—
00Feb 7, 1995Dec 19, 1994Yes
00Jan 25, 1995—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
305K
bbl, all reported
Jun 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089878H-1 InjectionPlugged Dec 15, 20148001,5003,887–4,111

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737846, documented in the API reference.