WELL · 42-417-37861 · DISTRICT 7

Stunkard 2-B #2

Plugged

Shackelford County · Stunkard (Miss.) field  · Vertical

Stunkard 2-B #2 (API 42-417-37861) is a plugged well in Shackelford County, plugged August 23, 2019, last operated by Van Operating Ltd..

The RRC has issued 2 drilling permits (amended once) between 1994 and 2000, permitted to 5,000 ft.

Completion filings report 7 formation tops, including Caddo, T/Caddo, B/Caddo, Duffer.

Its 3 leases have reported 36.1K barrels of oil and 244K mcf of gas since November 1994, last reporting in August 2019. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Van Operating Ltd.

Albany, TX · P-5 Y, filed Dec 10, 2021 · 96 permits on file · (325) 725-4542

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVan Operating Ltd.
Production reportsVan Operating, Ltd.through Apr 2007
Latest permitVan Operating, Ltd.Jun 7, 2000
5,000
total depth, ft
3
permits on file
Jun 7, 2000
last permit issued
Apr 29, 1997
completed
36.1K
cumulative oil, bbl
244K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1994 THROUGH Aug 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 29, 1997
Shut in
—
Plugged
Aug 23, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stunkard "2B" G-8-177547Diller (Lake Sand)Van Operating, Ltd.1096.4KFeb 2000 – Aug 2019
Stunkard 2-B O-8-27384Stunkard (Miss.)Van Operating, Ltd.136.1K93.4KNov 1994 – Dec 2001
Stunkard 2-B G-8-160735Stunkard (Miss.)Van Operating, Ltd.1053.9KNov 1996 – Jul 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jones Company, Ltd.Nov 1994 → Jul 1995
  2. 2Van Operating, Ltd.Aug 1995 → Apr 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495629-99RecompletionVan Operating, Ltd.May 30, 2000Jun 7, 2000Feb 15, 20004,320
427933-98DrillJones Company, Ltd.Dec 29, 1994Sep 13, 1994Oct 13, 19944,710
427933-99DrillJones Company, Ltd.Sep 12, 1994Sep 13, 1994—5,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-160735————
—— G-8-177547————
—— O-8-27384————

Formation tops

As filed on W-2/G-1. Subsea from 1,290 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,027-2,737
T/Caddo4,027-2,737
B/Caddo4,260-2,970
B/Caddo4,266-2,976
Duffer4,363-3,073
T/Duffer4,363-3,073
MississippianMISS4,457-3,167
T/Miss4,457-3,167

Perforations

Perforated and open-hole intervals.

FromToType
4,2704,282Perforated
4,4664,476Perforated
4,4794,630Perforated
4,6664,676Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.62517417.5165 S
13.37517417.5165 S
8.6252,11912900 S
8.6252,11912.375900 S
8.6252,11913900 S
4.54,7107.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 2000May 30, 2000Yes
00Jul 12, 2000——
00Jun 24, 1998Jun 5, 1998—
00Dec 30, 1996Nov 27, 1996—
00Dec 6, 1996——
00Mar 10, 1995Dec 30, 1994Yes
00Jan 4, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737861, documented in the API reference.