WELL · 42-417-37862 · DISTRICT 7

Davis Merrick #12

Plugged

Shackelford County · Shackelford County Regular field  · Vertical

Davis Merrick #12 (API 42-417-37862) is a plugged well in Shackelford County, plugged June 11, 2010, last operated by Schkade Production CO..

The RRC has issued one drilling permit, issued September 13, 1994, permitted to 1,990 ft.

It was permitted by Schkade Bros. Operating Company and has since transferred to Schkade Production CO. on the wellbore schedule.

Completion filings report one formation top, including Bluff Creek.

Its lease has reported 110K barrels of oil and 34 mcf of gas since January 1993, last reporting in July 2020. The lease carries 14 wells, so these are lease totals, not this well alone.

Operator of record

Schkade Production Co.

Permitted by Schkade Bros. Operating Company; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Jun 5, 2020 · 1 permits on file · (325) 668-7367

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSchkade Production Co.
Production reportsSchkade Production Co.through Sep 2017
Latest permitSchkade Bros. Operating CompanySep 13, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,990
total depth, ft
1
permits on file
Sep 13, 1994
last permit issued
Oct 28, 1994
completed
110K
cumulative oil, bbl
34
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 28, 1994
Shut in
—
Plugged
Jun 11, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, Merrick O-8-3183Shackelford County RegularSchkade Production Co.14110K34Jan 1993 – Jul 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Schkade Bros. Operating CompanyJan 1993 → Aug 2002
  2. 2Schkade Production Co.Sep 2002 → Sep 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427932-99DrillSchkade Bros. Operating CompanySep 12, 1994Sep 13, 1994Sep 28, 19941,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-3183————

Formation tops

As filed on W-2/G-1. Subsea from 1,760 ft elevation.Download CSV →

FormationMD ftSubsea
Bluff Creek1,630130

Perforations

Perforated and open-hole intervals.

FromToType
1,6301,638Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,6887.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 1995Feb 7, 1995—
00Feb 16, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
378K
bbl, all reported
Jul 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081914H-1 InjectionPlugged Jun 29, 20105008001,630–1,638

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 34,225(-100%)

01K2K3K20092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41737862, documented in the API reference.