WELL · 42-417-38121 · DISTRICT 7
Nail Ranch 41B #20S
Shackelford County · Jumpstart (Lower Frye) field · Injection · Vertical
Nail Ranch 41b #20S (API 42-417-38121) is a well in Shackelford County operated by Daylight Petroleum LLC, completed May 8, 1997 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued March 11, 1997, permitted to 2,000 ft.
It was permitted by L.C.S. Production Company and has since transferred to Daylight Petroleum LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Dothan, Frye Sand, Frye Sd., Jumpstart (Lwr. Frye).
Its lease has reported 193K barrels of oil and 8.68K mcf of gas since May 1996, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 43K barrels injected in the 12 months reported through June 2025.
Operator of record
Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 4, 2026 · 7 permits on file · (800) 223-5609
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Daylight Petroleum LLC |
| Production reports | Daylight Petroleum LLCthrough Apr 2026 |
| Latest permit | L.C.S. Production CompanyMar 11, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Mar 11, 1997
- last permit issued
- May 8, 1997
- completed
- 193K
- cumulative oil, bbl
- 8.68K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 8, 1997
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail Ranch "41B" O-8-27853 | Jumpstart (Lower Frye) | Daylight Petroleum LLC | 12 | 193K | 8.68K | May 1996 – Jul 2026 |
Oil, barrels lease total
Last 12 months 722 · prior 12 240(+201%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1L.C.S. Production CompanyMay 1996 → Feb 1998
- 2T-N-T Engineering, Inc.Mar 1998 → Jun 2016
- 3Avad Operating, LLCJul 2016 → Jul 2019
- 4Daylight Petroleum LLCAug 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459586-99 | Drill | L.C.S. Production Company | Mar 7, 1997 | Mar 11, 1997 | Apr 17, 1997 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27853 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,488 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dothan | 687 | 801 |
| Frye Sand | 768 | 720 |
| Frye Sd. | 768 | 720 |
| Jumpstart (Lwr. Frye) | 880 | 608 |
| Lower Frye | 880 | 608 |
| LWR Frye | 880 | 608 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 860 | 900 | Perforated |
| 893 | 902 | Perforated |
| 894 | 902 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.875 | 101 | 11 | 80 S |
| 7.625 | 101 | 11 | 80 S |
| 4.5 | 973 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 13, 2010 | Jul 2, 2009 | — |
| 00 | May 21, 1998 | Mar 3, 1998 | — |
| 00 | Jul 30, 1997 | May 16, 1997 | Yes |
| 00 | Jul 10, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38121 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38121 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 43K
- bbl, last 12 reported months
- 632K
- bbl, all reported
- Jun 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000085945 | H-1 Injection | Active | 800 | 430 | 860–900 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 42,957 · prior 12 3,640(+1080%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738121, documented in the API reference.