WELL · 42-417-38173 · DISTRICT 7

Matthews 19 #1

Plugged

Shackelford County · Oxford (Caddo) field  · Directional

Matthews 19 #1 (API 42-417-38173) is a plugged well in Shackelford County, plugged July 31, 2012, last operated by Millennium Operating Company.

The RRC has issued 4 drilling permits (amended twice) between 1997 and 2002, permitted to 4,900 ft.

Completion filings report 4 formation tops, including Palo Pinto, Gardner Sand, Lower Gardner Ss, Mississippian.

Operator of record

Millennium Operating Company

Houston, TX · P-5 Y, filed Nov 4, 2025 · 13 permits on file · (713) 385-8610

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMillennium Operating Company
Production reportsMillennium Operating Companythrough Nov 2010
Latest permitMillennium Operating CompanyNov 4, 2002
4,900
total depth, ft
6
permits on file
Nov 4, 2002
last permit issued
Dec 1, 1999
completed
0
cumulative oil, bbl
420K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1997 THROUGH Apr 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1999
Shut in
—
Plugged
Jul 31, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Matthews '19' G-8-193318Meredith Ann (Miss.)Millennium Operating Company10191KDec 2002 – Apr 2013
Matthews "19" G-8-175382Oxford (Caddo)Millennium Operating Company1086.1KDec 1999 – Dec 2002
Matthews "19" G-8-166171Meredith Ann (Miss.)Breck Operating Corp.10144KDec 1997 – Nov 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Breck Operating Corp.Dec 1997 → Apr 2002
  2. 2Millennium Operating CompanyDec 2002 → Nov 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
525149-99RecompletionMillennium Operating CompanyOct 31, 2002Nov 4, 2002Nov 27, 20024,505
489512-99RecompletionBreck Operating Corp.Nov 15, 1999Nov 22, 1999Nov 24, 19994,050
476658-99Field transferBreck Operating Corp.May 27, 1998May 27, 1998Oct 29, 19974,600
468112-97DrillBreck Operating Corp.Apr 9, 1998Oct 13, 1997—4,600
468112-98DrillBreck Operating Corp.Oct 14, 1997Oct 13, 1997Oct 29, 19974,900
468112-99DrillBreck Operating Corp.Oct 13, 1997Oct 13, 1997—4,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-166171————
—— G-8-175382————
—— G-8-193318————

Formation tops

As filed on W-2/G-1. Subsea from 1,362 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto2,047-685
Palo PintoPALO PINTO LS2,047-685
Gardner Sand3,087-1,725
Lower Gardner SS3,087-1,725
MississippianMISS4,287-2,925

Perforations

Perforated and open-hole intervals.

FromToType
3,9403,975Perforated
4,2874,400Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62562812.25375 S
5.54,5057.875185 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2003Jan 24, 2003—
00Mar 14, 2003——
00Apr 24, 2000Dec 17, 1999—
00Jan 13, 2000——
00Jul 1, 1998May 8, 1998—
00Mar 19, 1998Jan 5, 1998Yes
00Feb 3, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738173, documented in the API reference.