WELL · 42-417-38195 · DISTRICT 7
Nail Ranch 19 #4S
Shackelford County · Jumpstart (Lower Frye) field · Vertical
Nail Ranch 19 #4S (API 42-417-38195) is a well in Shackelford County operated by T-N-T Engineering Inc., completed April 16, 1998.
The RRC has issued 2 drilling permits in 1998, permitted to 2,000 ft.
Completion filings report 3 formation tops, including Dothan Lm, Stockwether Lime, Stockwether Lm.
Its 2 leases have reported 213K barrels of oil and 10.3K mcf of gas since April 1998, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.
Operator of record
Fort Worth, TX · P-5 Delinquent, filed Jul 18, 2018 · 185 permits on file · (817) 921-1889
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | T-N-T Engineering Inc. |
| Production reports | Daylight Petroleum LLCthrough Apr 2026 |
| Latest permit | T-N-T Engineering, Inc.Sep 22, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 2
- permits on file
- Sep 22, 1998
- last permit issued
- Apr 16, 1998
- completed
- 213K
- cumulative oil, bbl
- 10.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 16, 1998
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail Ranch "19" O-8-28489 | Jumpstart, N. (L. Frye) | Daylight Petroleum LLC | 8 | 213K | 10.3K | May 1998 – Jul 2026 |
| Nail Ranch "19" O-8-28472 | Jumpstart (Lower Frye) | T-N-T Engineering, Inc. | 1 | 0 | 0 | Apr 1998 – Dec 1998 |
Oil, barrels lease total
Last 12 months 2,518 · prior 12 2,822(-11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1T-N-T Engineering, Inc.May 1998 → Jun 2016
- 2Avad Operating, LLCJul 2016 → Jul 2019
- 3Daylight Petroleum LLCMar 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 479272-99 | Field transfer | T-N-T Engineering, Inc. | Sep 4, 1998 | Sep 22, 1998 | Apr 2, 1998 | 2,000 |
| 475056-99 | Drill | T-N-T Engineering, Inc. | Apr 6, 1998 | Apr 7, 1998 | Apr 2, 1998 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-28472 | — | — | — | — |
| — | — O-8-28489 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,419 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dothan LM | 617 | 802 |
| Stockwether Lime | 862 | 557 |
| Stockwether LM | 862 | 557 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 823 | 835 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,098 | 6.75 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 3, 1998 | Sep 4, 1998 | — |
| 00 | Oct 6, 1998 | Jun 5, 1998 | Yes |
| 00 | Jun 24, 1998 | Jun 5, 1998 | Yes |
| 00 | Jun 15, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38195 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38195 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738195, documented in the API reference.