WELL · 42-417-38495 · DISTRICT 7
Snyder #1
Shackelford County · Moran W. (Congl.) field · Temp Abandoned · Vertical
Snyder #1 (API 42-417-38495) is a well in Shackelford County operated by Sage Oil And Gas LLC, completed June 25, 2005 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued February 3, 2005, permitted to 4,500 ft.
It was permitted by Raylee Operating Company and has since transferred to Sage Oil And Gas LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Tannehill, Conglomerate, Duffer.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Raylee Operating Company; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Sep 4, 2025 · (940) 567-1145
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sage Oil and Gas LLC |
| Production reports | Arrowhead Productions, LPthrough Jul 2019 |
| Latest permit | Raylee Operating CompanyFeb 3, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,500
- total depth, ft
- 1
- permits on file
- Feb 3, 2005
- last permit issued
- Jun 25, 2005
- completed
- 0
- cumulative oil, bbl
- 407K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 25, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Snyder G-8-211335 | Moran, W. (Congl.) | Sage Oil and Gas, LLC | 1 | 0 | 407K | Jul 2005 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Raylee Operating CompanyJul 2005 → Dec 2011
- 2Arrowhead Productions, LPJan 2012 → Jul 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 557109-99 | Drill | Raylee Operating Company | Feb 1, 2005 | Feb 3, 2005 | — | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-8-211335 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,430 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,923 | 3,933 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 138 | 12.25 | 100 S |
| 4.5 | 1,250 | 7.875 | — |
| 4.5 | 4,118 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 12, 2005 | Aug 15, 2005 | Yes |
| 00 | Oct 10, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38495 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38495 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738495, documented in the API reference.