WELL · 42-417-38513 · DISTRICT 7
Nail 92 #6
Shackelford County · Shackelford County Regular field · Vertical
Nail 92 #6 (API 42-417-38513) is a plugged well in Shackelford County, plugged September 12, 2007, last operated by Ftc Consulting LLC.
The RRC has issued one drilling permit, issued May 10, 2005, permitted to 1,999 ft.
It was permitted by Cottonwood Petroleum CO. and has since transferred to Ftc Consulting LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Coleman Junction, Sedwick, Dothan.
Its lease has reported 12.2K barrels of oil and 13 mcf of gas since May 2004, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cottonwood Petroleum Co.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Jun 4, 2026 · 2 permits on file · (325) 668-6618
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | FTC Consulting LLC |
| Production reports | Clavo Oil, LLCthrough May 2012 |
| Latest permit | Cottonwood Petroleum Co.May 10, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,999
- total depth, ft
- 1
- permits on file
- May 10, 2005
- last permit issued
- Jun 10, 2005
- completed
- 12.2K
- cumulative oil, bbl
- 13
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 10, 2005
- Shut in
- —
- Plugged
- Sep 12, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail "92" O-8-29397 | Shackelford County Regular | FTC Consulting, LLC | 4 | 12.2K | 13 | May 2004 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cottonwood Petroleum Co.May 2004 → May 2009
- 2Clavo Oil, LLCJun 2009 → May 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600424-99 | Drill | Cottonwood Petroleum Co. | May 9, 2005 | May 10, 2005 | May 16, 2005 | 1,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29397 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,737 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 740 | 997 |
| Sedwick | 908 | 829 |
| Dothan | 1,063 | 674 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,206 | 1,208 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,330 | 6.75 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 18, 2005 | Jun 16, 2005 | Yes |
| 00 | Aug 12, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38513 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38513 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738513, documented in the API reference.