WELL · 42-417-38514 · DISTRICT 7
Trice Methodist 400 #3
Shackelford County · Shackelford County Regular field · Producing · Vertical
Trice Methodist 400 #3 (API 42-417-38514) is a well in Shackelford County operated by Basin Operating Inc., completed September 23, 2005 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 11, 2005, permitted to 1,000 ft.
It was permitted by Tracker Mineral and has since transferred to Basin Operating Inc. on the wellbore schedule.
Completion filings report one formation top, including King Sand.
Its lease has reported 9.9K barrels of oil and 70 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Tracker Mineral; the EWA schedule now lists a different operator.
Albany, TX · P-5 Y, filed Apr 4, 2026 · 4 permits on file · (817) 233-7077
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Basin Operating Inc. |
| Production reports | Basin Operating Inc.through Apr 2026 |
| Latest permit | Tracker MineralMay 11, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 1
- permits on file
- May 11, 2005
- last permit issued
- Sep 23, 2005
- completed
- 9.9K
- cumulative oil, bbl
- 70
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 23, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Trice Methodist "400" O-8-26741 | Shackelford County Regular | Basin Operating Inc. | 3 | 9.9K | 70 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 66 · prior 12 135(-51%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tracker MineralJan 1993 → Aug 2006
- 23-M ProductionAug 2010 → Jan 2012
- 3Royal Texan Energy Co.Feb 2012 → Jun 2013
- 4M.J.O.G., Inc.Jul 2013 → May 2014
- 5AB Reserve, LLCJun 2014 → Dec 2020
- 6Basin Operating Inc.Jan 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600512-99 | Drill | Tracker Mineral | May 10, 2005 | May 11, 2005 | Aug 18, 2005 | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-26741 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 574 | 576 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 633 | 6.75 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 19, 2006 | Jan 12, 2006 | Yes |
| 00 | Feb 6, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38514 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38514 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738514, documented in the API reference.