WELL · 42-417-38532 · DISTRICT 7
Nail 43 #1
Shackelford County · Shackelford County Regular field · Vertical
Nail 43 #1 (API 42-417-38532) is a plugged well in Shackelford County, plugged January 13, 2014, last operated by T-N-T Engineering Inc..
The RRC has issued one drilling permit, issued July 19, 2005, permitted to 2,000 ft.
It was permitted by Boo-Row Pipe & Supply, Inc. and has since transferred to T-N-T Engineering Inc. on the wellbore schedule.
Completion filings report one formation top, including Cook.
Its lease has reported 174 barrels of oil and 1.1K mcf of gas since August 2005, last reporting in June 2014.
Operator of record
Permitted by Boo-Row Pipe & Supply, Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Mar 4, 2026 · 185 permits on file · (817) 999-8481
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | T-N-T Engineering Inc. |
| Production reports | Clavo Oil, LLCthrough Dec 2010 |
| Latest permit | Boo-Row Pipe & Supply, Inc.Jul 19, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,000
- total depth, ft
- 1
- permits on file
- Jul 19, 2005
- last permit issued
- Oct 10, 2005
- completed
- 174
- cumulative oil, bbl
- 1.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Jun 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 10, 2005
- Shut in
- —
- Plugged
- Jan 13, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail 43 O-8-29816 | Shackelford County Regular | T-N-T Engineering, Inc. | 1 | 174 | 1.1K | Aug 2005 – Jun 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Boo-Row Pipe & Supply, Inc.Jun 2006 → Jan 2007
- 2Clavo Oil, LLCFeb 2007 → Dec 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603639-99 | Drill | Boo-Row Pipe & Supply, Inc. | Jul 19, 2005 | Jul 19, 2005 | Sep 3, 2005 | 2,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29816 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,455 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cook | 1,072 | 383 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,072 | 1,079 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 101 | 11 | 80 S |
| 4.5 | 1,195 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 4, 2007 | Jun 14, 2006 | Yes |
| 00 | Dec 7, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38532 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38532 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738532, documented in the API reference.