WELL · 42-417-38569 · DISTRICT 7
Nail 120 (M-J) #105
Shackelford County · Cook Ranch field · Shut IN · Vertical
Nail 120 (M-J) #105 (API 42-417-38569) is a well in Shackelford County operated by Tom-Tom Operating LLC, completed April 25, 2006 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued January 23, 2006, permitted to 1,695 ft.
It was permitted by Synergy Operating CO., LLC and has since transferred to Tom-Tom Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Dothan Lm., Tannahill Sd, Flippen Coal.
Its lease has reported 121K barrels of oil and 52 mcf of gas since January 1993, last reporting in July 2026. The lease carries 18 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Synergy Operating Co., LLC; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jun 4, 2026 · 8 permits on file · (214) 673-8848
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tom-Tom Operating LLC |
| Production reports | Tom-Tom Operating, LLCthrough Apr 2026 |
| Latest permit | Synergy Operating Co., LLCJan 23, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,695
- total depth, ft
- 1
- permits on file
- Jan 23, 2006
- last permit issued
- Apr 25, 2006
- completed
- 121K
- cumulative oil, bbl
- 52
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 25, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 18 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail 120 (M-J) O-8-16502 | Cook Ranch | Tom-Tom Operating, LLC | 18 | 121K | 52 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 489 · prior 12 1,058(-54%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Furry Producing CompanyJan 1993 → Jun 1993
- 2Holson Well ServiceJul 1993 → Sep 1999
- 3Dahab Energy Inc.Oct 1999 → Dec 2001
- 4Synergy Operating Co., LLCJan 2002 → Apr 2023
- 5Tollett OilMay 2023 → Nov 2024
- 6Tom-Tom Operating, LLCDec 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 612565-99 | Drill | Synergy Operating Co., LLC | Jan 17, 2006 | Jan 23, 2006 | — | 1,695 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-16502 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Dothan Lm. | 1,172 |
| Tannahill SD | 1,366 |
| Flippen Coal | 1,512 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,366 | 1,372 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,473 | 6.75 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 25, 2006 | May 11, 2006 | Yes |
| 00 | May 17, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38569 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38569 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.