WELL · 42-417-38576 · DISTRICT 7
Davis A #5604
Shackelford County · Windham West (3400) field · Shut IN · Vertical
Davis A #5604 (API 42-417-38576) is a well in Shackelford County operated by Grayrock Energy II LLC, completed April 28, 2006 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued March 9, 2006, permitted to 4,999 ft.
It was permitted by L.C.S. Production Company and has since transferred to Grayrock Energy II LLC on the wellbore schedule.
Completion filings report one formation top, including Morris Sand.
Its lease has reported 70 barrels of oil and 96 mcf of gas since May 2006, last reporting in July 2026.
Operator of record
Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Grayrock Energy II LLC |
| Production reports | L.C.S. Production Companythrough Jan 2007 |
| Latest permit | L.C.S. Production CompanyMar 9, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,999
- total depth, ft
- 2
- permits on file
- Mar 9, 2006
- last permit issued
- Apr 28, 2006
- completed
- 70
- cumulative oil, bbl
- 96
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 28, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis "A" O-8-29736 | Windham, West (3400) | Grayrock Energy II, LLC | 1 | 70 | 96 | May 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1L.C.S. Production CompanyMay 2006 → Jun 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 615533-98 | Drill | L.C.S. Production Company | May 12, 2006 | Mar 9, 2006 | — | 4,999 |
| 615533-99 | Drill | L.C.S. Production Company | Mar 8, 2006 | Mar 9, 2006 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-29736 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,832 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morris Sand | 3,434 | -1,602 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,434 | 3,441 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 124 | 12.25 | 75 S |
| 4.5 | 3,630 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 4, 2006 | Jun 8, 2006 | Yes |
| 00 | Aug 3, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-38576 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-38576 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41738576, documented in the API reference.