WELL · 42-417-38577 · DISTRICT 7

Davis #4901

Y

Shackelford County · Windham West (3400) field · Shut IN  · Vertical

Davis #4901 (API 42-417-38577) is a well in Shackelford County operated by Grayrock Energy II LLC, completed April 12, 2006 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued March 15, 2006, permitted to 4,999 ft.

It was permitted by L.C.S. Production Company and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report one formation top, including Morris Sand.

Its lease has reported 78.5K barrels of oil and 72.1K mcf of gas since April 2006, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Grayrock Energy II LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsGrayrock Energy II, LLCthrough Apr 2026
Latest permitL.C.S. Production CompanyMar 15, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,999
total depth, ft
2
permits on file
Mar 15, 2006
last permit issued
Apr 12, 2006
completed
78.5K
cumulative oil, bbl
72.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 12, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis O-8-29708Windham, West (3400)Grayrock Energy II, LLC578.5K72.1KApr 2006 – Jul 2026

Oil, barrels lease total

Last 12 months 572 · prior 12 609(-6%)

050100202420252026

Gas, mcf lease total

Last 12 months 1,412 · prior 12 97(+1356%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1L.C.S. Production CompanyApr 2006 → Apr 2009
  2. 2Plantation Operating, LLCMay 2009 → Nov 2011
  3. 3Merit Energy CompanyDec 2011 → May 2017
  4. 4Rover Petroleum Operating, LLCJun 2017 → Dec 2023
  5. 5Grayrock Energy II, LLCJan 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
615538-98DrillL.C.S. Production CompanyApr 13, 2006Mar 15, 2006Mar 23, 20064,999
615538-99DrillL.C.S. Production CompanyMar 8, 2006Mar 15, 2006—4,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-29708————

Formation tops

As filed on W-2/G-1. Subsea from 1,894 ft elevation.Download CSV →

FormationMD ftSubsea
Morris Sand3,418-1,524

Perforations

Perforated and open-hole intervals.

FromToType
3,4213,431Perforated
3,4383,446Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529012.5175 S
4.53,6007.875140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 7, 2006Apr 13, 2006Yes
00May 9, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738577, documented in the API reference.