WELL · 42-417-38711 · DISTRICT 7

Davis B #7521

Y

Shackelford County · Windham West (3400) field · Temp Abandoned  · Vertical

Davis B #7521 (API 42-417-38711) is a well in Shackelford County operated by Grayrock Energy II LLC, completed July 12, 2007 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued May 17, 2007, permitted to 5,500 ft.

It was permitted by L.C.S. Production Company and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Morris Sand, Conglomerate.

No lease production has been reported under this well’s leases.

Operator of record

Grayrock Energy II LLC

Permitted by L.C.S. Production Company; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Aug 4, 2025 · (214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsnone
Latest permitL.C.S. Production CompanyMay 17, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
May 17, 2007
last permit issued
Jul 12, 2007
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis "B" G-8-229373Windham, West (3400)Grayrock Energy II, LLC100Jul 2007 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
638392-99DrillL.C.S. Production CompanyMay 4, 2007May 17, 2007May 25, 20075,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-8-229373————

Formation tops

As filed on W-2/G-1. Subsea from 1,959 ft elevation.Download CSV →

FormationMD ftSubsea
Morris Sand3,409-1,450
Conglomerate4,760-2,801

Perforations

Perforated and open-hole intervals.

FromToType
3,4093,414Perforated
4,7604,766Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513512.25100 S
4.54,8597.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 18, 2007Aug 24, 2007Yes
00Sep 11, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41738711, documented in the API reference.