WELL · 42-417-39058 · DISTRICT 9
Nail Ranch 75 #1
Shackelford County · Newark East (Barnett Shale) field · Vertical
Nail Ranch 75 #1 (API 42-417-39058) is a plugged well in Shackelford County, plugged January 19, 2023, last operated by Beehive Operating LLC.
The RRC has issued one drilling permit, issued March 1, 2010, permitted to 5,500 ft.
It was permitted by Hilltex Operating Company, LLC and has since transferred to Beehive Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Caddo, Barnett, Mississippian.
Its lease has reported 902 barrels of oil and 23.8K mcf of gas since March 2010, last reporting in February 2023.
Operator of record
Permitted by Hilltex Operating Company, LLC; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed May 4, 2026 · (877) 682-1308
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Beehive Operating LLC |
| Production reports | Hilltex Operating Company, LLCthrough Jul 2012 |
| Latest permit | Hilltex Operating Company, LLCMar 1, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 1
- permits on file
- Mar 1, 2010
- last permit issued
- Mar 26, 2010
- completed
- 902
- cumulative oil, bbl
- 23.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Feb 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 26, 2010
- Shut in
- —
- Plugged
- Jan 19, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nail Ranch 75 O-13-31610 | Newark, East (Barnett Shale) | Beehive Operating, LLC | 1 | 902 | 23.8K | Mar 2010 – Feb 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hilltex Operating Company, LLCMay 2010 → Jul 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 691923-99 | Drill | Hilltex Operating Company, LLC | Feb 26, 2010 | Mar 1, 2010 | Mar 16, 2010 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31610 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,681 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CaddoCADDO LIME | 4,716 | -3,035 |
| BarnettBARNETT SHALE | 4,964 | -3,283 |
| MississippianMISSISSIPPI LIME | 5,124 | -3,443 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,079 | 5,085 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 163 | 12.5 | 120 S |
| 4.5 | 5,185 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 7, 2010 | May 11, 2010 | Yes |
| 00 | Jul 29, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-39058 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-39058 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41739058, documented in the API reference.