WELL · 42-417-39199 · DISTRICT 7
Casey 30 A #7
Shackelford County · Shackelford County Regular field · Producing · Vertical
Casey 30 A #7 (API 42-417-39199) is a well in Shackelford County operated by Strawn Operating CO. L.L.C., completed July 1, 2011 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued June 15, 2011, permitted to 1,500 ft.
It was permitted by Abernathy Auto, Inc. and has since transferred to Strawn Operating CO. L.L.C. on the wellbore schedule.
Completion filings report one formation top, including Tannehill.
Its lease has reported 9.9K barrels of oil since January 2011, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Abernathy Auto, Inc.; the EWA schedule now lists a different operator.
EL Paso, TX · P-5 Y, filed Jan 5, 2026 · 15 permits on file · (325) 370-9598
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Strawn Operating Co. L.L.C. |
| Production reports | Strawn Operating Co., L.L.C.through Oct 2025 |
| Latest permit | Abernathy Auto, Inc.Jun 15, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,500
- total depth, ft
- 1
- permits on file
- Jun 15, 2011
- last permit issued
- Jul 1, 2011
- completed
- 9.9K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 1, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Casey 30 "A" O-8-30626 | Shackelford County Regular | Strawn Operating Co., L.L.C. | 7 | 9.9K | 0 | Jan 2011 – Jul 2026 |
Oil, barrels lease total
Last 12 months 5 · prior 12 13(-62%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Abernathy Auto, Inc.Jan 2011 → Dec 2011
- 2Strawn Operating Co., L.L.C.Jan 2012 → Oct 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 717808-99 | Drill | Abernathy Auto, Inc. | Jun 6, 2011 | Jun 15, 2011 | Jun 22, 2011 | 1,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-30626 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,585 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Tannehill | 882 | 703 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 882 | 888 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,215 | 6.75 | 195 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 30, 2013 | Sep 25, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-417-39199 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-417-39199 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41739199, documented in the API reference.