WELL · 42-419-30334 · DISTRICT 6

Stephens G.H. #2

Y

Shelby County · Joaquin (Travis Peak) field · Producing  · Vertical

Stephens G.H. #2 (API 42-419-30334) is a well in Shelby County operated by Brookston Energy Inc., completed October 31, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued February 4, 1981, permitted to 9,000 ft.

It was permitted by Petro-Lewis Corporation and has since transferred to Brookston Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including James Lime, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Brookston Energy Inc.

Permitted by Petro-Lewis Corporation; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Jun 4, 2026 · 46 permits on file · (903) 312-8885

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBrookston Energy Inc.
Production reportsBrookston Energy, Inc.through Apr 2026
Latest permitPetro-Lewis CorporationFeb 4, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Feb 4, 1981
last permit issued
Oct 31, 1993
completed
0
cumulative oil, bbl
1.92M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 31, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stephens, G.H. G-6-94568Joaquin (Travis Peak)Brookston Energy, Inc.101.92MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 3,525 · prior 12 3,662(-4%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonat Exploration Company -TylerJan 1993 → Dec 1999
  2. 2EL Paso Production CompanyJan 2000 → Mar 2002
  3. 3Hunt Petroleum CorporationApr 2002 → Nov 2008
  4. 4XTO Energy Inc.Dec 2008 → Aug 2016
  5. 5Brookston Energy, Inc.Sep 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
107466-99DrillPetro-Lewis CorporationFeb 4, 1981Feb 4, 1981Mar 19, 19819,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-94568————

Formation tops

As filed on W-2/G-1. Subsea from 256 ft elevation.Download CSV →

FormationMD ftSubsea
James LimeJAMES5,393-5,137
Pettit5,712-5,456
Travis Peak6,319-6,063

Perforations

Perforated and open-hole intervals.

FromToType
6,5127,862Perforated
6,6326,638Perforated
6,6736,679Perforated
6,8706,884Perforated
7,1167,124Perforated
7,2317,814Perforated
7,3677,379Perforated
7,5407,560Perforated
7,8317,851Perforated
7,8527,862Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,39914.75918 S
2.3757,169——
5.57,9987.8752,025 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 16, 1994Dec 13, 1993—
00Jun 15, 1990Feb 13, 1989—
00Jan 12, 1984Jul 6, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41930334, documented in the API reference.