WELL · 42-419-30382 · DISTRICT 6

Wilson Gas Unit #1

Plugged

Shelby County · Tenaha (Jurassic) field  · Vertical

Wilson Gas Unit #1 (API 42-419-30382) is a plugged well in Shelby County, plugged September 18, 2002, last operated by Sonora Petroleum Corp..

The RRC has issued 2 drilling permits between 1981 and 1997, permitted to 11,500 ft.

Completion filings report 6 formation tops, including Anhydrite, Rodessa, James Lime, Pettit.

Its 2 leases have reported 8.01K barrels of oil and 50K mcf of gas since January 1993, last reporting in August 2003. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Sonora Petroleum Corp.

Austin, TX · P-5 Y, filed Sep 7, 2012 · 11 permits on file · (800) 872-3755

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSonora Petroleum Corp.
Production reportsSonora Petroleum Corp.through Oct 1998
Latest permitSonora Petroleum Corp.Sep 12, 1997
11,500
total depth, ft
2
permits on file
Sep 12, 1997
last permit issued
Oct 6, 1982
completed
8.01K
cumulative oil, bbl
50K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 6, 1982
Shut in
—
Plugged
Sep 18, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wilson O-6-13788Tenaha(glen Rose)Sonora Petroleum Corp.18.01K3.52KJul 1997 – Aug 2003
Wilson Gas Unit G-6-102492Tenaha (Jurassic)Sonora Petroleum Corp.1046.4KJan 1993 – Jul 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sonora Petroleum Corp.Jan 1993 → Oct 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
466932-99RecompletionSonora Petroleum Corp.Aug 29, 1997Sep 12, 1997Jun 30, 199710,832
144119-99DrillGrace Petroleum Corp.Nov 30, 1981Nov 30, 1981Nov 30, 198111,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-102492————
—— O-6-13788————

Formation tops

As filed on W-2/G-1. Subsea from 347 ft elevation.Download CSV →

FormationMD ftSubsea
Anhydrite5,225-4,878
Rodessa5,364-5,017
James Lime5,848-5,501
Pettit6,106-5,759
Bossier9,530-9,183
Jurassic10,698-10,351

Perforations

Perforated and open-hole intervals.

FromToType
4,0054,104Perforated
10,79010,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,52212.251,400 S
2.37510,640——
5.510,8328.751,775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 1998Aug 29, 1997Yes
00Mar 16, 1998——
00Jan 12, 1984Oct 12, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41930382, documented in the API reference.