WELL · 42-419-30658 · DISTRICT 6
Pickering Lumber Co. #13
Shelby County · Joaquin (Travis Peak) field · Vertical
Pickering Lumber CO. #13 (API 42-419-30658) is a plugged well in Shelby County, plugged April 23, 2020, last operated by Brookston Energy Inc..
The RRC has issued one drilling permit, issued February 24, 1993, permitted to 8,000 ft.
It was permitted by Sonat Exploration Company -Tyler and has since transferred to Brookston Energy Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including James Lime, Pettit, Travis Peak.
Operator of record
Permitted by Sonat Exploration Company -Tyler; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Jun 4, 2026 · 46 permits on file · (903) 312-8885
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brookston Energy Inc. |
| Production reports | XTO Energy Inc.through Oct 2010 |
| Latest permit | Sonat Exploration Company -TylerFeb 24, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 1
- permits on file
- Feb 24, 1993
- last permit issued
- Nov 23, 1998
- completed
- 0
- cumulative oil, bbl
- 739K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Apr 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 23, 1998
- Shut in
- —
- Plugged
- Apr 23, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pickering Lumber Co. G-6-149345 | Joaquin (Travis Peak) | Brookston Energy, Inc. | 1 | 0 | 739K | Mar 1994 – Apr 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sonat Exploration Company -TylerMar 1994 → Dec 1999
- 2EL Paso Production CompanyJan 2000 → Mar 2002
- 3Hunt Petroleum CorporationApr 2002 → Nov 2008
- 4XTO Energy Inc.Dec 2008 → Oct 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409313-99 | Drill | Sonat Exploration Company -Tyler | Feb 24, 1993 | Feb 24, 1993 | Jan 1, 1994 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-149345 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 204 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James Lime | 5,330 | -5,126 |
| James LimeJAMES LM | 5,330 | -5,126 |
| Pettit | 5,630 | -5,426 |
| Travis Peak | 6,240 | -6,036 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,405 | 7,420 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,125 | 17.5 | 941 S |
| 4.5 | 7,600 | 7.875 | 1,475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1999 | Dec 28, 1998 | — |
| 00 | Jun 10, 1994 | Apr 5, 1994 | Yes |
| 00 | Jun 2, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-30658 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-30658 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41930658, documented in the API reference.