WELL · 42-419-30669 · DISTRICT 6

Sabine River #1

Plugged

Shelby County · Joaquin (Travis Peak) field  · Directional

Sabine River #1 (API 42-419-30669) is a plugged well in Shelby County, plugged September 23, 2015, last operated by Brammer Engineering Inc..

The RRC has issued one drilling permit, issued December 12, 1994, permitted to 10,500 ft.

It was permitted by Franks Petroleum Inc. and has since transferred to Brammer Engineering Inc. on the wellbore schedule.

Completion filings report one formation top, including Travis Peak.

Operator of record

Brammer Engineering Inc.

Permitted by Franks Petroleum Inc.; the EWA schedule now lists a different operator.

Shreveport, LA · P-5 Y, filed Nov 4, 2025 · 194 permits on file · (800) 865-2708

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBrammer Engineering Inc.
Production reportsBrammer Engineering, Inc.through Aug 2015
Latest permitFranks Petroleum Inc.Dec 12, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
1
permits on file
Dec 12, 1994
last permit issued
Mar 7, 2013
completed
0
cumulative oil, bbl
2.98M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Sep 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 7, 2013
Shut in
—
Plugged
Sep 23, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sabine River G-6-155923Joaquin (Travis Peak)Brammer Engineering, Inc.102.98MJul 1995 – Sep 2015

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Justiss Oil Company, Inc.Aug 1995 → Feb 2001
  2. 2Will-Drill Production Co., Inc.Mar 2001 → Feb 2006
  3. 3Peoples Energy Prod.-TX, L.P.Mar 2006 → Sep 2007
  4. 4Coronado Energy E&P Company, LLCOct 2007 → Nov 2010
  5. 5Brammer Engineering, Inc.Dec 2010 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427394-99DrillFranks Petroleum Inc.Aug 25, 1994Dec 12, 1994Mar 17, 199510,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-155923————

Formation tops

As filed on W-2/G-1. Subsea from 180 ft elevation.Download CSV →

FormationMD ftSubsea
Travis Peak6,230-6,050

Perforations

Perforated and open-hole intervals.

FromToType
6,4676,656Perforated
6,4678,570Perforated
6,4696,472Perforated
6,4906,496Perforated
6,7206,902Perforated
7,0157,020Perforated
7,0567,274Perforated
7,1637,168Perforated
8,0598,066Perforated
8,0718,074Perforated
8,0788,082Perforated
8,0878,087Perforated
8,0878,091Perforated
8,091—Perforated
8,0938,095Perforated
8,1948,197Perforated
8,2008,202Perforated
8,4788,485Perforated
8,5278,533Perforated
8,5498,558Perforated
8,5668,570Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,35517.51,206 S
9.6254,75812.25685 S
4.58,6556.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 25, 2013May 28, 2013—
00Jun 26, 2013Feb 14, 2013—
00Jul 19, 2001May 23, 2001—
00Sep 14, 1998Jun 26, 1998—
00Feb 17, 1998Jan 16, 1997—
00Mar 18, 1996Jan 29, 1996—
00Feb 7, 1996Dec 19, 1995—
00Dec 13, 1995Sep 14, 1995Yes
00Nov 10, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41930669, documented in the API reference.