WELL · 42-419-30798 · DISTRICT 6
Patroon Bayou 147 #2
Shelby County · Huxley (6100) field · Horizontal
Patroon Bayou 147 #2 (API 42-419-30798) is a plugged horizontal well in Shelby County, plugged January 21, 2020, last operated by Etoco L.P..
The RRC has issued one drilling permit (amended once), issued June 5, 2001, permitted to 7,350 ft.
It was permitted by Brown, Tom Inc. and has since transferred to Etoco L.P. on the wellbore schedule.
Completion filings report 4 formation tops, including Austin Chalk, BMA, James Lime, Pine Island.
Operator of record
Permitted by Brown, Tom Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 4, 2026 · 48 permits on file · (713) 805-3001
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Etoco L.P. |
| Production reports | Etoco, L.P.through Jan 2017 |
| Latest permit | Brown, Tom Inc.Jun 5, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,350
- total depth, ft
- 2
- permits on file
- Jun 5, 2001
- last permit issued
- Aug 2, 2001
- completed
- 0
- cumulative oil, bbl
- 479K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH May 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 2, 2001
- Shut in
- —
- Plugged
- Jan 21, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Patroon Bayou 147 G-6-187816 | Patroon Bayou (James Lime) | Etoco, L.P. | 1 | 0 | 479K | Aug 2001 – May 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brown, Tom Inc.Aug 2001 → Dec 2004
- 2Encana Oil & Gas(usa) Inc.Jan 2005 → Jun 2009
- 3Etoco, L.P.Feb 2010 → Jan 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 509860-98 | Drill | Brown, Tom Inc. | Oct 19, 2001 | Jun 5, 2001 | — | 7,350 |
| 509860-99 | Drill | Brown, Tom Inc. | Jun 5, 2001 | Jun 5, 2001 | Jun 11, 2001 | 7,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-187816 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 347 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 3,692 | -3,345 |
| BMA | 6,392 | -6,045 |
| James Lime | 6,943 | -6,596 |
| Pine Island | 7,169 | -6,822 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,279 | 12,837 | Open hole |
| 10,078 | 12,373 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,646 | 12.25 | 859 S |
| 7 | 7,290 | 8.75 | 474 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 2002 | Oct 25, 2001 | Yes |
| 00 | Apr 4, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-30798 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-30798 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41930798, documented in the API reference.