WELL · 42-419-30817 · DISTRICT 6

Savell -C- #3H

Y

Shelby County · Martinsville SE. (James) field · Temp Abandoned  · Horizontal · Directional

Savell -C- #3H (API 42-419-30817) is a horizontal well in Shelby County operated by PG-M International Operating LLC, completed July 1, 2002 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued November 28, 2001, permitted to 7,500 ft.

It was permitted by Blue Ridge Group, Inc. and has since transferred to PG-M International Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Saratoga Lime, Glen Rose, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

PG-M International Operating LLC

Permitted by Blue Ridge Group, Inc.; the EWA schedule now lists a different operator.

Borger, TX · P-5 Y, filed Sep 4, 2025 · 83 permits on file · (817) 724-2196

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePG-M International Operating LLC
Production reportsPG-M International Operating,llcthrough May 2019
Latest permitBlue Ridge Group, Inc.Nov 28, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
3
permits on file
Nov 28, 2001
last permit issued
Jul 1, 2002
completed
0
cumulative oil, bbl
275K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 1, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Savell -C- G-6-192215Martinsville, SE. (James)PG-M International Operating,llc10275KJul 2002 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Blue Ridge Group, Inc.Aug 2002 → Jun 2006
  2. 2Hibbard Energy, LPJul 2006 → Jun 2009
  3. 3Enexco, Inc.Jul 2009 → Nov 2011
  4. 4Coreterra Operating, LLCDec 2011 → Sep 2016
  5. 5PG-M International Operating,llcOct 2016 → May 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
515670-97DrillBlue Ridge Group, Inc.Nov 22, 2002Nov 28, 2001Nov 30, 20017,500
515670-98DrillBlue Ridge Group, Inc.Dec 12, 2001Nov 28, 2001—7,500
515670-99DrillBlue Ridge Group, Inc.Nov 28, 2001Nov 28, 2001—7,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-192215————

Formation tops

As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →

FormationMD ftSubsea
Saratoga Lime3,255-3,232
Glen RoseGLENROSE4,320-4,297
James Lime7,215-7,192

Perforations

Perforated and open-hole intervals.

FromToType
7,21512,527Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,14512.25649 S
77,4638.75383 S
4.512,5076.125—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 14, 2003Sep 13, 2002Yes
00Jan 15, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41930817, documented in the API reference.