WELL · 42-419-30859 · DISTRICT 6
Graves Gas Unit #3
Shelby County · Garrison (Travis Peak) field · Producing · Vertical
Graves Gas Unit #3 (API 42-419-30859) is a well in Shelby County operated by North Lake Resources LLC, completed January 31, 2004 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued June 5, 2003, permitted to 8,800 ft.
It was permitted by Enerquest Corporation and has since transferred to North Lake Resources LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Enerquest Corporation; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Mar 4, 2026 · (405) 934-1010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Lake Resources LLC |
| Production reports | Enerquest Corporationthrough Oct 2020 |
| Latest permit | Enerquest CorporationJun 5, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,800
- total depth, ft
- 2
- permits on file
- Jun 5, 2003
- last permit issued
- Jan 31, 2004
- completed
- 0
- cumulative oil, bbl
- 900K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 31, 2004
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: R
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graves Gas Unit G-6-202668 | Garrison (Travis Peak) | North Lake Resources LLC | 1 | 0 | 900K | Jan 2004 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enerquest CorporationFeb 2004 → Oct 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 532562-98 | Drill | Enerquest Corporation | Sep 15, 2003 | Jun 5, 2003 | Jan 6, 2004 | 8,800 |
| 532562-99 | Drill | Enerquest Corporation | May 30, 2003 | Jun 5, 2003 | — | 8,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-202668 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 276 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 6,025 | -5,749 |
| James LimeJAMES | 6,520 | -6,244 |
| Pettit | 6,800 | -6,524 |
| Travis Peak | 7,350 | -7,074 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,407 | 8,697 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,548 | 11 | 393 S |
| 4.25 | 8,805 | 7.875 | 735 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 8, 2004 | Jul 12, 2004 | Yes |
| 00 | Aug 10, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-30859 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-30859 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41930859, documented in the API reference.