WELL · 42-419-31008 · DISTRICT 6
USA Courtney #1
Shelby County · Joaquin (Travis Peak) field · Vertical
USA Courtney #1 (API 42-419-31008) is a plugged well in Shelby County, plugged October 6, 2022, last operated by Amplify Energy Operating LLC.
The RRC has issued one drilling permit, issued April 13, 2005, permitted to 10,300 ft.
It was permitted by Kcs Resources, Inc. and has since transferred to Amplify Energy Operating LLC on the wellbore schedule.
Completion filings report 4 formation tops, including James Lime, Sligo, Travis Peak, Cotton Valley.
Operator of record
Permitted by KCS Resources, Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 4, 2026 · 13 permits on file · (713) 490-8901
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Amplify Energy Operating LLC |
| Production reports | Classic Operating Co. LLCthrough Apr 2012 |
| Latest permit | KCS Resources, Inc.Apr 13, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,300
- total depth, ft
- 1
- permits on file
- Apr 13, 2005
- last permit issued
- Dec 5, 2005
- completed
- 0
- cumulative oil, bbl
- 208K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Oct 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 5, 2005
- Shut in
- —
- Plugged
- Oct 6, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| USA Courtney G-6-216623 | Joaquin (Travis Peak) | Amplify Energy Operating LLC | 1 | 0 | 208K | Dec 2005 – Oct 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1KCS Resources, Inc.Dec 2005 → Feb 2009
- 2KCS Resources, LLCMar 2009 → Apr 2010
- 3Classic Operating Co. LLCMay 2010 → Apr 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 560427-99 | Drill | KCS Resources, Inc. | Apr 13, 2005 | Apr 13, 2005 | Apr 19, 2005 | 10,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-216623 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 284 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James Lime | 5,540 | -5,256 |
| Sligo | 5,858 | -5,574 |
| Travis Peak | 6,478 | -6,194 |
| Cotton Valley | 8,824 | -8,540 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,642 | 8,076 | Perforated |
| 8,220 | 8,230 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,006 | 12.25 | 689 S |
| 4.5 | 10,215 | 7.875 | 1,045 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 12, 2006 | Dec 27, 2005 | Yes |
| 00 | Jun 28, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-31008 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-31008 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41931008, documented in the API reference.