WELL · 42-419-31199 · DISTRICT 6

Wheeler #2

Plugged

Shelby County · Stockman (Travis Peak) field  · Vertical

Wheeler #2 (API 42-419-31199) is a plugged well in Shelby County, plugged September 29, 2021, last operated by Coert Holdings 1 LLC.

The RRC has issued one drilling permit, issued September 4, 2007, permitted to 9,000 ft.

It was permitted by Encore Operating, L.P. and has since transferred to Coert Holdings 1 LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Pine Island Shale, Pettit, Travis Peak.

Operator of record

Coert Holdings 1 LLC

Permitted by Encore Operating, L.P.; the EWA schedule now lists a different operator.

Greenwich, CT · P-5 Y, filed May 6, 2022 · (203) 340-7850

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCoert Holdings 1 LLC
Production reportsCoert Holdings 1 LLCthrough Oct 2021
Latest permitEncore Operating, L.P.Sep 4, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Sep 4, 2007
last permit issued
Nov 16, 2007
completed
0
cumulative oil, bbl
516K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Dec 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 16, 2007
Shut in
—
Plugged
Sep 29, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wheeler G-6-248721Stockman (Travis Peak)Coert Holdings 1 LLC10516KNov 2007 – Dec 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encore Operating, L.P.Nov 2007 → Nov 2010
  2. 2Enduro Operating LLCDec 2010 → Aug 2018
  3. 3Coert Holdings 1 LLCSep 2018 → Oct 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
645276-99DrillEncore Operating, L.P.Aug 29, 2007Sep 4, 2007Oct 16, 20079,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-248721————

Formation tops

As filed on W-2/G-1. Subsea from 380 ft elevation.Download CSV →

FormationMD ftSubsea
Pine Island Shale6,918-6,538
Pettit6,984-6,604
Travis Peak7,563-7,183

Perforations

Perforated and open-hole intervals.

FromToType
7,7588,418Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,55311430 S
5.58,7217.875845 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 4, 2009Jan 7, 2008Yes
00Jun 30, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931199, documented in the API reference.