WELL · 42-419-31199 · DISTRICT 6
Wheeler #2
Shelby County · Stockman (Travis Peak) field · Vertical
Wheeler #2 (API 42-419-31199) is a plugged well in Shelby County, plugged September 29, 2021, last operated by Coert Holdings 1 LLC.
The RRC has issued one drilling permit, issued September 4, 2007, permitted to 9,000 ft.
It was permitted by Encore Operating, L.P. and has since transferred to Coert Holdings 1 LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pine Island Shale, Pettit, Travis Peak.
Operator of record
Permitted by Encore Operating, L.P.; the EWA schedule now lists a different operator.
Greenwich, CT · P-5 Y, filed May 6, 2022 · (203) 340-7850
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Coert Holdings 1 LLC |
| Production reports | Coert Holdings 1 LLCthrough Oct 2021 |
| Latest permit | Encore Operating, L.P.Sep 4, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Sep 4, 2007
- last permit issued
- Nov 16, 2007
- completed
- 0
- cumulative oil, bbl
- 516K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Dec 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 16, 2007
- Shut in
- —
- Plugged
- Sep 29, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wheeler G-6-248721 | Stockman (Travis Peak) | Coert Holdings 1 LLC | 1 | 0 | 516K | Nov 2007 – Dec 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Encore Operating, L.P.Nov 2007 → Nov 2010
- 2Enduro Operating LLCDec 2010 → Aug 2018
- 3Coert Holdings 1 LLCSep 2018 → Oct 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 645276-99 | Drill | Encore Operating, L.P. | Aug 29, 2007 | Sep 4, 2007 | Oct 16, 2007 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-248721 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 380 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pine Island Shale | 6,918 | -6,538 |
| Pettit | 6,984 | -6,604 |
| Travis Peak | 7,563 | -7,183 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,758 | 8,418 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,553 | 11 | 430 S |
| 5.5 | 8,721 | 7.875 | 845 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 4, 2009 | Jan 7, 2008 | Yes |
| 00 | Jun 30, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-31199 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-31199 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41931199, documented in the API reference.