WELL · 42-419-31308 · DISTRICT 6
Adams GU #2
Shelby County · Stockman (Travis Peak) field · Vertical
Adams GU #2 (API 42-419-31308) is a plugged well in Shelby County, plugged April 30, 2019, last operated by Buffco Production Inc..
The RRC has issued one drilling permit, issued July 2, 2008, permitted to 9,500 ft.
It was permitted by C. W. Resources, Inc. and has since transferred to Buffco Production Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including James Lime, Pettit, Travis Peak.
Operator of record
Permitted by C. W. Resources, Inc.; the EWA schedule now lists a different operator.
Longview, TX · P-5 Y, filed Sep 4, 2025 · 397 permits on file · (903) 736-4697
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Buffco Production Inc. |
| Production reports | Buffco Production Inc.through Apr 2019 |
| Latest permit | C. W. Resources, Inc.Jul 2, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,500
- total depth, ft
- 1
- permits on file
- Jul 2, 2008
- last permit issued
- Jul 31, 2018
- completed
- 0
- cumulative oil, bbl
- 543K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Apr 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 31, 2018
- Shut in
- —
- Plugged
- Apr 30, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Adams GU G-6-244577 | Stockman (Travis Peak) | Buffco Production Inc. | 1 | 0 | 543K | Jan 2009 – Apr 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1C. W. Resources, Inc.Jan 2009 → Nov 2016
- 2Buffco Production Inc.Dec 2016 → Apr 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 664373-99 | Drill | C. W. Resources, Inc. | Jun 12, 2008 | Jul 2, 2008 | Nov 7, 2008 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-244577 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 357 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James Lime | 6,670 | -6,313 |
| Pettit | 7,360 | -7,003 |
| Travis Peak | 7,375 | -7,018 |
| Travis Peak | 7,615 | -7,258 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,375 | 7,389 | Perforated |
| 7,621 | 8,670 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,601 | 12.25 | 950 S |
| 5.5 | 4,035 | 7.875 | 485 S |
| 5.5 | 8,998 | 7.875 | 465 S |
| 5.5 | — | 7.875 | 485 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 2019 | Nov 8, 2018 | — |
| 00 | Mar 4, 2009 | Jan 26, 2009 | Yes |
| 00 | Feb 3, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-419-31308 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-419-31308 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/41931308, documented in the API reference.