WELL · 42-419-31776 · DISTRICT 6

Thompson SWD #1

WaterN

Shelby County  · Vertical

Thompson Swd #1 (API 42-419-31776) is a former disposal or injection well in Shelby County, last operated by Longbranch Energy, LP; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued December 28, 2015, permitted to 4,000 ft.

Operator of record

Longbranch Energy, LP

Center, TX · P-5 Y, filed Sep 4, 2025 · 18 permits on file · (936) 598-8236

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLongbranch Energy, LPDec 28, 2015
4,000
total depth, ft
1
permits on file
Dec 28, 2015
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
811969-99DrillLongbranch Energy, LPNov 13, 2015Dec 28, 2015—4,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000111426W-14 DisposalCanceled Nov 27, 201820,0001,5003,300–3,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/41931776, documented in the API reference.