WELL · 42-421-30380 · DISTRICT 10
Cornelsen #2
Sherman County · Texas Hugoton field · Vertical
Cornelsen #2 (API 42-421-30380) is a plugged well in Sherman County, plugged December 19, 2008, last operated by Schmid Properties Inc..
The RRC has issued one drilling permit, issued February 4, 1987, permitted to 3,400 ft.
It was permitted by Jnc Resources Company and has since transferred to Schmid Properties Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Krider, Council Grove.
Operator of record
Permitted by JNC Resources Company; the EWA schedule now lists a different operator.
Hico, TX · P-5 Y, filed Jun 4, 2026 · 1 permits on file · (866) 202-4059
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Schmid Properties Inc. |
| Production reports | Schmid Properties, Inc.through Nov 2005 |
| Latest permit | JNC Resources CompanyFeb 4, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,400
- total depth, ft
- 1
- permits on file
- Feb 4, 1987
- last permit issued
- May 22, 1987
- completed
- 0
- cumulative oil, bbl
- 128K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 22, 1987
- Shut in
- —
- Plugged
- Dec 19, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cornelsen G-14-124782 | Texas Hugoton | Schmid Properties, Inc. | 1 | 0 | 128K | Jan 1993 – Dec 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1JNC Resources CompanyJan 1993 → May 1997
- 2Rockwell Energy CorporationJun 1997 → Jul 1999
- 3Schmid Properties, Inc.Aug 1999 → Nov 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 326107-99 | Drill | JNC Resources Company | Feb 3, 1987 | Feb 4, 1987 | — | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-124782 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,505 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Krider | 2,866 | 639 |
| Council Grove | 3,064 | 441 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,866 | 2,974 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 628 | 12.25 | 295 S |
| 4.5 | 1,988 | 7.875 | 285 S |
| 4.5 | 3,469 | 7.875 | 245 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 18, 1987 | Jul 15, 1987 | Yes |
| 00 | Aug 13, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-421-30380 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-421-30380 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42130380, documented in the API reference.