WELL · 42-421-30385 · DISTRICT 10
Coldwater Ranch #1021RE
Sherman County · Vertical
Coldwater Ranch #1021RE (API 42-421-30385) is a plugged well in Sherman County, plugged May 18, 1987, last operated by Phillips Petroleum Company.
The RRC has issued 2 drilling permits between 1987 and 1995, permitted to 5,700 ft.
Completion filings report 2 formation tops, including Red Cave, Panhandle Lime.
Operator of record
Houston, TX · P-5 Y, filed Jun 20, 2003 · 2,544 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Phillips Petroleum CompanyApr 7, 1995 |
- 5,700
- total depth, ft
- 2
- permits on file
- Apr 7, 1995
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Mar 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- May 18, 1987
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coldwater Ranch G-14-155841 | Panhandle, West (Red Cave) | Phillips Petroleum Company | 1 | 0 | 0 | May 1995 – Mar 1996 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 434672-99 | Reenter | Phillips Petroleum Company | Apr 7, 1995 | Apr 7, 1995 | Apr 13, 1995 | 2,300 |
| 328208-99 | Drill | H-30, Inc. | Mar 25, 1987 | Mar 25, 1987 | — | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-155841 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,428 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,930 | 1,498 |
| Panhandle Lime | 2,512 | 916 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,040 | 2,054 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,922 | 12.25 | 700 S |
| 5.5 | 2,258 | 7.875 | 175 S |
| 5.5 | 5,750 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 1995 | Sep 7, 1995 | Yes |
| 00 | Nov 7, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-421-30385 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-421-30385 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42130385, documented in the API reference.