WELL · 42-421-30678 · DISTRICT 10
Nathan #1
Sherman County · Texas Hugoton field · Temp Abandoned · Vertical
Nathan #1 (API 42-421-30678) is a well in Sherman County operated by Jiahe Energy LLC, completed February 21, 1998 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued January 7, 1998, permitted to 3,050 ft.
It was permitted by Taylor, Gordon Oil Company, LP and has since transferred to Jiahe Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Red Cave, Panhandle Lime, Herrington.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Taylor, Gordon Oil Company, LP; the EWA schedule now lists a different operator.
Katy, TX · P-5 Y, filed Dec 4, 2025 · (713) 623-3598
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jiahe Energy LLC |
| Production reports | Jiahe Energy, LLCthrough Dec 2022 |
| Latest permit | Taylor, Gordon Oil Company, LPJan 7, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,050
- total depth, ft
- 1
- permits on file
- Jan 7, 1998
- last permit issued
- Feb 21, 1998
- completed
- 0
- cumulative oil, bbl
- 283K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 21, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Nathan G-14-169771 | Texas Hugoton | Jiahe Energy, LLC | 1 | 0 | 283K | Feb 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Taylor, Gordon Oil Company, LPApr 1998 → Apr 2001
- 2Oil Producers, Inc. of KansasMay 2001 → Mar 2020
- 3Jiahe Energy, LLCMay 2022 → Dec 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 471932-99 | Drill | Taylor, Gordon Oil Company, LP | Jan 7, 1998 | Jan 7, 1998 | Jan 20, 1998 | 3,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-169771 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,470 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Red Cave | 1,770 | 1,700 |
| Panhandle Lime | 2,334 | 1,136 |
| Herrington | 2,712 | 758 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,720 | 2,920 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,532 | 12.25 | 745 S |
| 5.5 | 2,985 | 7.875 | 155 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 24, 1998 | May 4, 1998 | Yes |
| 00 | Sep 14, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-421-30678 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-421-30678 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/42130678, documented in the API reference.