WELL · 42-421-30678 · DISTRICT 10

Nathan #1

Y

Sherman County · Texas Hugoton field · Temp Abandoned  · Vertical

Nathan #1 (API 42-421-30678) is a well in Sherman County operated by Jiahe Energy LLC, completed February 21, 1998 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued January 7, 1998, permitted to 3,050 ft.

It was permitted by Taylor, Gordon Oil Company, LP and has since transferred to Jiahe Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Red Cave, Panhandle Lime, Herrington.

No lease production has been reported under this well’s leases.

Operator of record

Jiahe Energy LLC

Permitted by Taylor, Gordon Oil Company, LP; the EWA schedule now lists a different operator.

Katy, TX · P-5 Y, filed Dec 4, 2025 · (713) 623-3598

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJiahe Energy LLC
Production reportsJiahe Energy, LLCthrough Dec 2022
Latest permitTaylor, Gordon Oil Company, LPJan 7, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,050
total depth, ft
1
permits on file
Jan 7, 1998
last permit issued
Feb 21, 1998
completed
0
cumulative oil, bbl
283K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 21, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nathan G-14-169771Texas HugotonJiahe Energy, LLC10283KFeb 1998 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Taylor, Gordon Oil Company, LPApr 1998 → Apr 2001
  2. 2Oil Producers, Inc. of KansasMay 2001 → Mar 2020
  3. 3Jiahe Energy, LLCMay 2022 → Dec 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
471932-99DrillTaylor, Gordon Oil Company, LPJan 7, 1998Jan 7, 1998Jan 20, 19983,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-169771————

Formation tops

As filed on W-2/G-1. Subsea from 3,470 ft elevation.Download CSV →

FormationMD ftSubsea
Red Cave1,7701,700
Panhandle Lime2,3341,136
Herrington2,712758

Perforations

Perforated and open-hole intervals.

FromToType
2,7202,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,53212.25745 S
5.52,9857.875155 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 1998May 4, 1998Yes
00Sep 14, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/42130678, documented in the API reference.